Tradeoffs in Design-to-Budget Projects

نویسندگان

  • Franck M. Chatel
  • Wilfried Kruse
  • Ralf Faller
  • Michael Schmidhuber
چکیده

The possible tradeoffs depend upon different criteria (e.g. system availability, operational risk), whose relative importance is in turn imposed by the mission characteristics (e.g. recurring satellite routine operations, human spaceflight, LEOP). A methodology, issued from the optimization field, is first defined in order to evaluate the impact of these tradeoffs on the considered criteria. The methodology allows taking the mission characteristics into account and the allocated budget is modeled as a constraint of the problem. A list of cost reduction measures is then produced, supported by GSOC experience or the existing literature, together with an assessment of their impact on the criteria. Finally the methodology is applied in relation with a budget level to find out which cost reduction measures would satisfy the budget constraint and which criteria would be impacted.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Monitoring Health Spending Increases: Incremental Budget Analyses Reveal Challenging Tradeoffs

With each passing decade, health care has consumed a larger share of gross domestic product (GDP) and Federal budgets. By the 2000-2004 period, society was willing to devote over 20 percent of the cumulative increase in GDP and the cumulative increase in Federal outlays towards health care. The financing challenges are expected to become more acute for private payers as well as Federal, State, ...

متن کامل

A Budgeting Model for the Safety Unit of an Under Construction Metro Station in Tehran Using a Robust Optimization

Background: The construction of metro lines is a high-risk project. Using a budget-based model for the safety units of metro construction projects can help safety managers to spend optimal budget allocation. The purpose of this study was to plan a budget model based on safety unit performance in an under construction metro station for better budget allocation using robust optimization. Methods...

متن کامل

Route-aware MAC protocols for Sensor Networks

Fundamental tradeoffs between energy consumption and sustainable quality of services such as throughput and response time are critical in sensor networks because of limited and often irreplaceable battery power. This paper presents a novel energy saving approach, namely route-awareness. This approach provides a wide spectrum of design alternatives even under an extremely low energy budget. Rout...

متن کامل

∗Corresp MULTIOBJECTIVE OPTIMIZATION FOR INTEGRATED TOLERANCE ALLOCATION AND FIXTURE LAYOUT DESIGN IN MULTISTATION ASSEMBLY

Cost and product quality are significant attributes in manufacturing processes, such as multistation assembly. We use multiobjective optimization for integrated tolerance allocation and fixture layout design to address their interaction and to quantify tradeoffs among cost, product quality, and assembly process robustness. Design decisions relate to product tolerances, assembly process toleranc...

متن کامل

Profit Maximization Based on Customer Satisfaction Level in a Multi- Layer Multi-Product Supply Chain

This paper concerns with a mathematical model considering customer satisfaction requirements in a supply chain. The model tradeoffs the supply chain ability to fulfill the customers’ requirements and the limited budget in a variety of production phases. The decisions made here help to determine the profit provider price and economic quantity while the effective supplier and priori requireme...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2012