Executive rank , pay and project selection

نویسندگان

  • John M. Barron
  • Glen R. Waddell
چکیده

This paper extends the literature on executive compensation by developing and testing a principal-agent model in the context of project selection. The model’s focus on executive project selection decisions highlights the multidimensional nature of executive choices that affect the value of the firm. An executive not only makes an effort choice that determines the quality of information on which to base a decision but also sets the decision criteria for selecting projects. A project selection framework is also shown to introduce endogenous uncertainty into compensation that can influence the executive’s effort choice. Using an extensive data set, our empirical work supports the main hypotheses of the model, including the significance of executive rank in determining the extent of use of incentive pay in general and equitybased incentive pay in particular. r 2002 Elsevier Science B.V. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Grey-Based Fuzzy ELECTRE Model for Project Selection

Project selection is considered as an important problem in project management. It is multi-criteria in nature and is based on various quantitative and qualitative factors. The main purpose of this paper is to present a new rank-based method for project selection in outranking relation. According to this approach, decision alternatives were clustered in the concordance matrix and the discordance...

متن کامل

Multi-criteria approach to project portfolio selection considering structural hardness and correlations between projects

Project portfolio selection is very important subject of decision-makers in project-based organizations. The best assignment of resources to the most appropriate projects is necessary as financing projects with low benefit is just waste of organization's resources. However, existing project selection models pay not much attention the structure and special features of projects as a selection cri...

متن کامل

علل شکست و عدم نتیجه گیری مناسب از اجرای طرح های تحقیقاتی مصوب شورای پژوهشی دانشگاه علوم پزشکی تهران، 1364 تا پایان سال 1379

The major activity for vice chancellor for research at Tehran University of Medical Sciences (TUMS) is to monitor research projects undertaken by the academic staff. Sometimes projects have been failed in meeting their objectives. The aim of this project was the evaluation of the failure of the research projects at TUMS from the establishment date to 1379. A case-control survey was designed and...

متن کامل

Pay Convexity, Earnings Manipulation, and Project Continuation

This paper studies the optimal design of long-term executive pay plans when boards of directors use accounting information for investment decision-making and executives can take costly actions to manipulate this information. The model predicts that a shift to more convex executive pay plans, such as equity plans that rely more on options and less on stock, is associated with higher levels of ma...

متن کامل

A New Multi-objective Model for Multi-mode Project Planning with Risk

The purpose of this problem is to choose a set of project activities for crashing, in a way that the expected project time, cost and risk are minimized and the expected quality is maximized. In this problem, each project activity can be performed with a specific executive mode. Each executive mode is characterized with four measures, namely the expected time, cost, quality and risk. In this pap...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2000