Routing and scheduling for deployment of vessels for one of the world’s leading RoRo carriers

نویسندگان

  • Jørgen Glomvik Rakke
  • Guy Desaulniers
چکیده

Transportation of cars by sea is mainly performed by specialized vessels. These vessels are purpose built for transporting cars and trucks, but some also transport other rolling equipment (high and heavy) and non-containerized cargo (break bulk). In this paper we introduce a routing and scheduling problem for deployment of the fleet of roll-on roll-off (RoRo) vessels. This problem is based on a real-world problem faced by Wallenius Wilhelmsen Logistics (WWL), one of the world’s leading RoRo carriers. WWL operates more than 60 RoRo vessels, and transports more than 2.3 million vehicles, rolling equipment, and static cargo each year to destinations around the world. Maritime planning problems are also often divided into three modes of operation: liner, tramp, and industrial shipping (Lawrence, 1972). In liner shipping the ships operate according to a published itinerary and schedule similar to a bus, and the operator tries to maximize their profit from cargoes lifted. Tramp shipping resembles taxi services, where the ships follow the available cargoes and the operator tries to maximize the profit from mandatory and optional cargoes. Industrial shipping operators usually own and control both the cargoes and the ships, and the objective of the operator is usually to minimize transportation cost (Christiansen et al., 2007). Traditionally, planning is divided into three classes based on the length of the planning horizon: strategic, tactical, and operational. Strategic problems are long term planning problems, which in shipping usually means 5 to 20 years. Fleet size and mix, network design, and contract evaluation are all typical strategic planning problems. Problems with a planning horizon length of a few weeks up to 18 months are usually referred to as

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A multi-objective memetic algorithm for risk minimizing vehicle routing problem and scheduling problem

In this paper, a new approach to risk minimizing vehicle routing and scheduling problem is presented. Forwarding agents or companies have two main concerns for the collection of high-risk commodities like cash or valuable commodities between the central depot and the customers: one; because of the high value of the commodities transported, the risk of ambush and robbery are very high. Two; the ...

متن کامل

A multi-product vehicle routing scheduling model with time window constraints for cross docking system under uncertainty: A fuzzy possibilistic-stochastic programming

Mathematical modeling of supply chain operations has proven to be one of the most complex tasks in the field of operations management and operations research. Despite the abundance of several modeling proposals in the literature; for vast majority of them, no effective universal application is conceived. This issue renders the proposed mathematical models inapplicable due largely to the fact th...

متن کامل

Two phase genetic algorithm for vehicle routing and scheduling problem with cross-docking and time windows considering customer satisfaction

Cross-docking is a new warehousing policy in logistics which is widely used all over the world and attracts many researchers attention to study about in last decade. In the literature, economic aspects has been often studied, while one of the most significant factors for being successful in the competitive global market is improving quality of customer servicing and focusing on customer satisfa...

متن کامل

A JOINT DUTY CYCLE SCHEDULING AND ENERGY AWARE ROUTING APPROACH BASED ON EVOLUTIONARY GAME FOR WIRELESS SENSOR NETWORKS

Network throughput and energy conservation are two conflicting important performance metrics for wireless sensor networks. Since these two objectives are in conflict with each other, it is difficult to achieve them simultaneously. In this paper, a joint duty cycle scheduling and energy aware routing approach is proposed based on evolutionary game theory which is called DREG. Making a trade-off ...

متن کامل

Multi-objective routing and scheduling for relief distribution with split delivery in post-disaster response

Following the occurrence of unexpected events and natural disasters, a highly important relief operation is the transferring of relief commodities from the distribution centers (CDs) to shelters. In this paper, a three-level network consisting of depot of vehicles, distribution centers and shelters has been considered for routing and scheduling of relief vehicles through introducing a multi-obj...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2013