Minimizing a Makespan Under Uncertainty

نویسندگان

  • Jérôme Fortin
  • Pawel Zielinski
  • Didier Dubois
  • Hélène Fargier
چکیده

This paper reconsiders the most basic scheduling problem, that of minimizing the makespan of a partially ordered set of activities, in the context of incomplete knowledge. After positioning this paper in the scope of temporal networks under uncertainty, we provide a complete solution to the problem of finding floats of activities, and of locating surely critical ones, as they are often isolated. The minimal float problem is NP-hard while the maximal float problem is polynomial. New complexity results and efficient algorithms are provided for the interval-valued makespan minimization problem.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Meta heuristic for Minimizing Makespan in a Flow-line Manufacturing Cell with Sequence Dependent Family Setup Times

This paper presents a new mathematical model for the problem of scheduling part families and jobs within each part family in a flow line manufacturing cell where the setup times for each family are sequence dependent and it is desired to minimize the maximum completion time of the last job on the last machine (makespan) while processing parts (jobs) in each family together. Gaining an optimal s...

متن کامل

Stochastic and Robust Scheduling in the Cloud

Users of cloud computing services are offered rapid access to computing resources via the Internet. Cloud providers use different pricing options such as (i) time slot reservation in advance at a fixed price and (ii) on-demand service at a (hourly) pay-as-used basis. Choosing the best combination of pricing options is a challenging task for users, in particular, when the instantiation of comput...

متن کامل

Minimizing the total tardiness and makespan in an open shop scheduling problem with sequence-dependent setup times

We consider an open shop scheduling problem with setup and processing times separately such that not only the setup times are dependent on the machines, but also they are dependent on the sequence of jobs that should be processed on a machine. A novel bi-objective mathematical programming is designed in order to minimize the total tardiness and the makespan. Among several mult...

متن کامل

Minimizing Makespan in a Multiclass Fluid Network with Parameter Uncertainty

We introduce and investigate a new type of decision problem related to multiclass fluid networks. Optimization problems arising from fluid networks with known parameters have been studied extensively in the queueing, scheduling, and optimization literature. In this article, we explore the makespan problem in fluid networks, with the assumption that the parameters are known only through a probab...

متن کامل

Minimizing Makespan with Start Time Dependent Jobs in a Two Machine Flow Shop

[if gte mso 9]> The purpose of this paper is to consider the problem of scheduling a set of start time-dependent jobs in a two-machine flow shop, in which the actual processing times of jobs increase linearly according to their starting time. The objective of this problem is to minimize the makespan. The problem is known to be NP-hardness[ah1] ; therefore, there is no polynomial-time algorithm...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2005