Discrete-event Simulation of Lean Construction Processes

نویسنده

  • Iris D. Tommelein
چکیده

Little work has been done to date in formally modeling concepts of lean construction, such as uncertainty, waste, flow, conversion, and push vs. pull techniques. This lack of formalization has been blamed in part on the inability of the project-management tools commonly used in industry to describe the construction process and its salient features at a level at which lean production can be studied. However, existing process-level construction models prove to be useful in this regard. Accordingly, this paper describes the use of computer software for discrete-event simulation to represent various construction process characteristics relevant to lean production. Two examples are provided. The first one illustrates the flow and conversion of pipe spools through their design and installation process. Spools exemplify unique materials, measured in discrete quantities. The second one illustrates the flow and conversion of concrete through its batching and placement process. Concrete exemplifies bulk materials, measured by volume. The examples show what types of system-level information can be generated using discrete-event simulation and how this information may be used to redesign construction processes in order to make them leaner.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Concurrent control on resource planning and revenue/expenditure estimation in large-scale shell material embankment projects management using discrete-event simulation

Resource planning in large-scale construction projects has been a complicated management issue requiring mechanisms to facilitate decision making for managers. In the present study, a computer-aided simulation model is developed based on concurrent control of resources and revenue/expenditure. The proposed method responds to the demand of resource management and scheduling in shell material emb...

متن کامل

An integrated simulation-DEA approach to multi-criteria ranking of scenarios for execution of operations in a construction project

The purpose of this study is to examine different scenarios for implementing operations in the pre-construction phase of a project, based on several competing criteria with different importance levels in order to achieve a more efficient execution plan. This paper presents a new framework that integrates discrete event simulation (DES) and data envelopment analysis (DEA) to rank different scena...

متن کامل

ANALYSIS OF THE PRODUCTIVITY IN STRUCTURAL STEEL FABRICATION PROCESSES Evaluation and comparison of different Simulation-Software for the analysis and optimization of production processes at steel fabricators

Structural Steel Fabrication is a process in which there is a wide variety of product mix and where most of the products are unique in nature. A lot of work has been done to analyze the use of Discrete Event Simulation in various manufacturing and construction projects for application of lean concepts and other purposes to detect opportunities for optimization. However, there is a lot of differ...

متن کامل

Discrete and Continuous Simulation Approach to Optimize the Productivity of Modular Construction Element

Bolstered by significant productivity improvement in manufacturing technology, the construction paradigm has shifted toward industrialized construction methods, such as modular construction. Modular construction has benefitted from the long term development of the manufacturing technologies and core techniques used in the assembly production lines of construction prefabrication plants. Lean pro...

متن کامل

Determination of optimum of production rate of network failure prone manufacturing systems with perishable items using discrete event simulation and Taguchi design of experiment

This paper, considers Network Failure Manufacturing System (NFPMS) and production control policy of unreliable multi-machines, multi-products with perishable items. The production control policy is based on the Hedging Point Policy (HPP). The important point in the simulation of this system is assumed that the customers who receive perishable item are placed in priority queue of the customers w...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2005