CIFECENTER FOR INTEGRATED FACILITY ENGINEERING Compensatory Negotiation for Agent-Based Project Schedule Optimization and Coordination
نویسندگان
چکیده
This paper presents a formalized negotiation methodology for distributed project schedule optimization — a framework wherein a project can be rescheduled dynamically by all of the concerned project participants. The negotiation methodology is developed to allow agents to transfer utility to other agents for compensation of disadvantageous agreements through a multi-linked negotiation process, which leads to an individually rational and globally optimal solution. The electronic commerce system based on this negotiation methodology will allow software assistant agents to evaluate the impact of their changes and advise the human subcontractors. A multi-agent prototype system will test and verify the distributed project schedule optimization framework and will provide a foundation for facilitating collaboration among project participants over the Internet. The negotiation methodology for coordinating subcontractors may also be extended to electronic supply-chain issues.
منابع مشابه
CIFECENTER FOR INTEGRATED FACILITY ENGINEERING Compensatory Negotiation for Agent-Based Project Schedule Coordination
Practitioners have tried to solve a project schedule coordination problem involving many subcontractors with a centralized approach, but failed to provide a cohesive solution. They have overlooked a principle that general contractors cannot coordinate subcontractors like they do their own forces. The project schedule coordination problem could be solved better by subcontractors in a distributed...
متن کاملCompensatory Negotiation for Agent-Based Project Schedule Coordination
This paper presents a compensatory negotiation methodology for agent-based project schedule coordination — a framework wherein a project can be rescheduled dynamically by all of the concerned project participants. The compensatory negotiation methodology is developed to allow agents to transfer utility to other agents for compensation of disadvantageous agreements through a multi-linked negotia...
متن کاملCIFECENTER FOR INTEGRATED FACILITY ENGINEERING Observation, Theory, and Simulation of Integrated Concurrent Engineering: Grounded Theoretical Factors that Enable Radical Project Acceleration
متن کامل
CIFECENTER FOR INTEGRATED FACILITY ENGINEERING Observation, Theory, and Simulation of Integrated Concurrent Engineering: Risk Analysis Using Formal Models of Radical Project Acceleration
متن کامل
A Multi-objective optimization model for project scheduling with time-varying resource requirements and capacities
Proper and realistic scheduling is an important factor of success for every project. In reality, project scheduling often involves several objectives that must be realized simultaneously, and faces numerous uncertainties that may undermine the integrity of the devised schedule. Thus, the manner of dealing with such uncertainties is of particular importance for effective planning. A realistic sc...