A hybrid scatter search/electromagnetism meta-heuristic for project scheduling
نویسندگان
چکیده
In the last few decades, several effective algorithms for solving the resource-constrained project scheduling problem have been proposed. However, the challenging nature of this problem, summarised in its strongly NP-hard status, restricts the effectiveness of exact optimisation to relatively small instances. In this paper, we present a new meta-heuristic for this problem, able to provide near-optimal heuristic solutions for relatively large instances. The procedure combines elements from scatter search, a generic population-based evolutionary search method, and from a recently introduced heuristic method for the optimisation of unconstrained continuous functions based on an analogy with electromagnetism theory. We present computational experiments on standard benchmark datasets, compare the results with current state-of-the-art heuristics, and show that the procedure is capable of producing consistently good results for challenging instances of the resource-constrained project scheduling problem. We also demonstrate that the algorithm outperforms state-of-the-art existing heuristics. 2004 Elsevier B.V. All rights reserved.
منابع مشابه
Resource Constrained Project Scheduling with Material Ordering: Two Hybridized Meta-Heuristic Approaches (TECHNICAL NOTE)
Resource constrained project scheduling problem (RCPSP) is mainly investigated with the objective of either minimizing project makespan or maximizing project net present value. However, when material planning plays a key role in a project, the existing models cannot help determining material ordering plans to minimize material costs. In this paper, the RCPSP incorporated with the material order...
متن کاملProject scheduling optimization for contractor’s Net present value maximization using meta-heuristic algorithms: A case study
Today's competitive conditions have caused the projects to be carried out in the least possible time with limited resources. Therefore, managing and scheduling a project is a necessity for the project. The timing of a project is to specify a sequence of times for a series of related activities. According to their priority and their latency, so that between the time the project is completed and ...
متن کاملA hybrid scatter search heuristic for personalized crew rostering in the airline industry
The crew scheduling problem in the airline industry is extensively investigated in the operations research literature since efficient crew employment can drastically reduce operational costs of airline companies. Given the flight schedule of an airline company, crew scheduling is the process of assigning all necessary crew members in such a way that the airline is able to operate all its flight...
متن کاملAn Improved Tabu Search Algorithm for Job Shop Scheduling Problem Trough Hybrid Solution Representations
Job shop scheduling problem (JSP) is an attractive field for researchers and production managers since it is a famous problem in many industries and a complex problem for researchers. Due to NP-hardness property of this problem, many meta-heuristics are developed to solve it. Solution representation (solution seed) is an important element for any meta-heuristic algorithm. Therefore, many resear...
متن کاملA Path Relinking-Based Scatter Search for the Resource-Constrained Project Scheduling Problem
Project scheduling has received a growing attention from researchers for the last decades in order to propose models and methods to tackle scheduling problems for real-size projects. In this paper, we consider the resource-constrained project scheduling problem (RCPSP), which consists in scheduling the activities in order to minimize the project duration in presence of precedence and resource c...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- European Journal of Operational Research
دوره 169 شماره
صفحات -
تاریخ انتشار 2006