MineLib: a library of open pit mining problems

نویسندگان

  • Daniel G. Espinoza
  • Marcos Goycoolea
  • Eduardo Moreno
  • Alexandra Newman
چکیده

Similar to the mixed-integer programming library (MIPLIB), we present a library of publicly available test problem instances for three classical types of open pit mining problems: the ultimate pit limit problem and two variants of open pit production scheduling problems. The ultimate pit limit problem determines a set of notional three-dimensional blocks containing ore and/or waste material to extract to maximize value subject to geospatial precedence constraints. Open pit production scheduling problems seek to determine when, if ever, a block is extracted from an open pit mine. A typical objective is to maximize the net present value of the extracted ore; constraints include precedence and upper bounds on operational resource usage. Extensions of this problem can include (i) lower bounds on operational resource usage, (ii) the determination of whether a block is sent to a waste dump, i.e., discarded, or to a processing plant, i.e., to a facility that derives salable mineral from the block, (iii) average grade constraints at the processing plant, and (iv) inventories of extracted but unprocessed material. Although open pit mining problems have appeared in academic literature dating back to the 1960s, no standard representations exist, and there are no commonly available corresponding data sets. We describe some representative open pit mining problems, briefly mention related literature, and provide a library consisting of mathematical models and sets of instances, available on the Internet. We conclude with directions for use of this newly established mining library. The library serves not only as a suggestion of standard expressions of and available data for open pit mining problems, but also as encouragement for the development of increasingly sophisticated algorithms.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Investigation of Bishop’s and Janbu’s Models Capabilities on Slope Stability Problems with Special Consideration to Open-Pit Mining Operations

One of the most effective parameters in economics of open-pit mines is the pit slope angle, so that the slope angle more than the optimum value increases the probability of a large failure in the pit wall and the slope angle less than the optimum value leads to increasing stripping ratio and reducing net present value of mine. Therefore, in this paper, considering the limit equilibrium methods ...

متن کامل

Effects of geometrical and geomechanical properties on slope stability of open-pit mines using 2D and 3D finite difference methods

Slope stability analysis is one of the most important problems in mining and geotechnical engineering. Ignoring the importance of these problems can lead to significant losses. Selecting an appropriate method to analyze the slope stability requires a proper understanding of how different factors influence the outputs of the analyses. This paper evaluates the effects of considering the real geom...

متن کامل

New graph-based algorithms to efficiently solve large scale open pit mining optimisation problems

In themining optimisation literature, most researchers focused on two strategic-level and tactical-level openpit mine optimisation problems, which are respectively termed ultimate pit limit (UPIT) or constrained pit limit (CPIT). However, many researchers indicate that the substantial numbers of variables and constraints in realworld instances (e.g., with 50–1000 thousand blocks) make the CPIT’...

متن کامل

An Uncertainty-based Transition from Open Pit to Underground Mining

There are some large scale orebodies that extend from surface to the extreme depths of the ground. Such orebodies should be extracted by a combination of surface and underground mining methods. Economically, it is highly important to know the limit of upper and lower mining activities. This concern leads the mine designers to the transition problem, which is one of the most complicated problems...

متن کامل

ORE extraction and blending optimization model in poly- metallic open PIT mines by chance constrained one-sided goal programming

Determination a sequence of extracting ore is one of the most important problems in mine annual production scheduling. Production scheduling affects mining performance especially in a poly-metallic open pit mine with considering the imposed operational and physical constraints mandated by high levels of reliability in relation to the obtained actual results. One of the important operational con...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Annals OR

دوره 206  شماره 

صفحات  -

تاریخ انتشار 2013