A heuristic model for production scheduling in the foundry industry with the employ of fuzzy logic (004-0133)

نویسندگان

  • Raul Landmann
  • Região de Joinville
  • Rolf Hermann Erdmann
چکیده

This work describes the conception, development and application of a methodology for the production scheduling in foundries. It has two important and linked moments, which are the furnace scheduling and the molding machines scheduling. The challenge consists in determining an adequate sequencing of production orders in the molding lines, combining light weight with average and heavy pieces, in order to obtain a constant demand of molten metal in balance with the offer of furnace derived metal. The heuristic approach was chosen to search for a solution of the problem, and the fuzzy logic technique was selected for the representation and manipulation of experts knowledge, identified in a qualitative research. The application results demonstrated, besides the benefits of the knowledge systematization and the capacity of fast carrying out simulations to find the best alternatives of solution, a more efficient performance than the obtained by the foundries specialists.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Nurse rostering using fuzzy logic: A case study

In this paper, we used the fuzzy set theory for modeling flexible constraints and uncertain data in nurse scheduling problems and proposed a fuzzy linear model for nurse rostering problems. The developed model can produce rosters that satisfy hospital objectives, ward requirements and staff preferences by satisfying their requests as much as possible. Fuzzy sets are used for modeling demands of...

متن کامل

A Mathematical Model for a Flow Shop Scheduling Problem with Fuzzy Processing Times

This paper presents a mathematical model for a flow shop scheduling problem consisting of m machine and n jobs with fuzzy processing times that can be estimated as independent stochastic or fuzzy numbers. In the traditional flow shop scheduling problem, the typical objective is to minimize the makespan). However,, two significant criteria for each schedule in stochastic models are: expectable m...

متن کامل

A Novel Fuzzy Logic Base Scheduling Mechanism for Service Differentiation in IP Networks

Quality of Service (QoS) refers to a set of rules or techniques that help the network administrators use the available network resources optimally to manage the effects of congestion and to treat the applications according to their needs. The differentiated services architecture (DiffServ) allows providing quality of service to users. The major DiffServ premise is that individual flows with sim...

متن کامل

A UNIFIED MODEL FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH UNCERTAIN ACTIVITY DURATIONS

In this paper we present a unified (probabilistic/possibilistic) model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations and a concept of a heuristic approach connected to the theoretical model. It is shown that the uncertainty management can be built into any heuristic algorithm developed to solve RCPSP with deterministic activity durations. The esse...

متن کامل

A Hybrid Approach for Fuzzy Just-In-Time Flow Shop Scheduling with Limited Buffers and Deteriorating Jobs

This paper investigates the problem of just-in-time permutation flow shop scheduling with limited buffers and linear job deterioration in an uncertain environment. The fuzzy set theory is applied to describe this situation. A novel mixed-integer nonlinear program is presented to minimize the weighted sum of fuzzy earliness and tardiness penalties. Due to the computational complexities, the prop...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2006