A Variable Block Insertion Heuristic for the Blocking Flowshop Scheduling Problem with Total Flowtime Criterion

نویسندگان

  • Mehmet Fatih Tasgetiren
  • Quan-Ke Pan
  • Damla Kizilay
  • Kai-Zhou Gao
چکیده

In this paper, we present a variable block insertion heuristic (VBIH) algorithm to solve the blocking flowshop scheduling problem with the total flowtime criterion. In the VBIH algorithm, we define a minimum and a maximum block size. After constructing the initial sequence, the VBIH algorithm starts with a minimum block size being equal to one. It removes the block from the current sequence and inserts it into the partial sequence sequentially with a predetermined move size. The sequence, which is obtained after several block moves, goes under a variable local search (VLS), which is based on traditional insertion and swap neighborhood structures. If the new sequence obtained after the VLS local search is better than the current sequence, it replaces the current sequence. As long as it improves, it keeps the same block size. However, if it does not improve, the block size is incremented by one and a simulated annealing-type of acceptance criterion is used to accept the current sequence. This process is repeated until the block size reaches at the maximum block size. Furthermore, we present a novel constructive heuristic, which is based on the profile fitting heuristic from the literature. The proposed constructive heuristic is able to further improve the best known solutions for some larger instances in a few seconds. Parameters of the constructive heuristic and the VBIH algorithm are determined through a design of experiment approach. Extensive computational results on the Taillard’s well-known benchmark suite show that the proposed VBIH algorithm outperforms the discrete artificial bee colony algorithm, which is one of the most efficient algorithms recently in the literature. Ultimately, 52 out of the 150 best known solutions are further improved with substantial margins.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A hybrid genetic algorithm for solving no-wait flowshop scheduling problems

A hybrid genetic algorithm is proposed in this paper to minimize the makespan and the total flowtime in the no-wait flowshop scheduling problem, which is known to be NP-hard for more than two machines. The Variable Neighborhood Search is used as an improvement procedure in the last step of the genetic algorithm. First, comparisons are provided with respect to several techniques that are represe...

متن کامل

Hybrid Evolutionary Algorithm for Flowtime Minimisation in No-Wait Flowshop Scheduling

This research presents a novel approach to solve m-machine no-wait flowshop scheduling problem. A continuous flowshop problem with total flowtime as criterion is considered applying a hybrid evolutionary algorithm. The performance of the proposed method is evaluated and the results are compared with the best known in the literature. Experimental tests show the superiority of the evolutionary hy...

متن کامل

New VNS heuristic for total flowtime flowshop scheduling problem

This paper develops a new VNS approach to Permutational Flow shop Scheduling Problem with Total Flow time criterion. There are many hybrid approaches in the problem’s literature, that make use of VNS internally, usually applying job insert neighbourhood followed by job interchange neighbourhood. In this study different ways to combine both neighbourhoods were examined. All tests use the benchma...

متن کامل

A comprehensive review and evaluation of permutation flowshop heuristics to minimize flowtime

In recent years, a large number of heuristics have been proposed for the minimization of the total or mean flowtime/completion time of the well-known permutation flowshop scheduling problem. Although some literature reviews and comparisons have been made, they do not include the latest available heuristics and results are hard to compare as no common benchmarks and computing platforms have been...

متن کامل

A three-stage assembly flow shop scheduling problem with blocking and sequence-dependent set up times

This paper considers a three-stage assembly flowshop scheduling problem with sequence-dependent setup < /div> times at the first stage and blocking times between each stage in such a way that the weighted mean completion time and makespan are minimized. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time using traditiona...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Algorithms

دوره 9  شماره 

صفحات  -

تاریخ انتشار 2016