A Swift Heuristic Method for Work Order Scheduling under the Skilled-Workforce Constraint

نویسندگان

  • Nima Safaei
  • Corey Kiassat
چکیده

The considered problem is how to optimally allocate a set of jobs to technicians of different skills such that the number of technicians of each skill does not exceed the number of persons with that skill designation. The key motivation is the quick sensitivity analysis in terms of the workforce size which is quite necessary in many industries in the presence of unexpected work orders. A time-indexed mathematical model is proposed to minimize the total weighted completion time of the jobs. The proposed model is decomposed into a number of single-skill sub-problems so that each one is a combination of a series of nested binary Knapsack problems. A heuristic procedure is proposed to solve the problem. Our experimental results, based on a real-world case study, reveal that the proposed method quickly produces a schedule statistically close to the optimal one while the classical optimal procedure is very timeconsuming.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimization of an energy based bi-objective multi skilled resource investment project scheduling problem

Growing concern in the management of energy due to the increasing energy costs, has forced managers to optimize the amount of energy required to provide products and services. This research integrates an energy-based resource investment project-scheduling problem (RIP) under a multi-skilled structure of the resources. The proposed energy based multi skilled resource investment problem (EB-MSRIP...

متن کامل

Empowerment-based Workforce Scheduling Problem∗

The Workforce Scheduling Problem (WSP) concerns the scheduling of a multi-skilled workforce to geographically dispersed tasks. An effective solution to the problem is critical to companies’ performance and success. Organizations are becoming increasingly aware of the importance of enhancing employee empowerment and involvement in decision making. However, traditional approaches implemented to t...

متن کامل

A mathematical model for sustainable probabilistic network design problem with construction scheduling considering social and environmental issues

Recent facility location allocation problems are engaged with social, environmental and many other aspects, besides cost objectives.Obtaining a sustainable solution for such problems requires development of new mathematical modeling and optimization algorithms. In this paper, an uncapacitated dynamic facility location-network design problem with random budget constraints is considered. Social i...

متن کامل

Heuristic approach to solve hybrid flow shop scheduling problem with unrelated parallel machines

In hybrid flow shop scheduling problem (HFS) with unrelated parallel machines, a set of n jobs are processed on k machines. A mixed integer linear programming (MILP) model for the HFS scheduling problems with unrelated parallel machines has been proposed to minimize the maximum completion time (makespan). Since the problem is shown to be NP-complete, it is necessary to use heuristic methods to ...

متن کامل

Min Conflicts Based Heuristics for Rotating Workforce Scheduling Problem

Workforce scheduling problems are typical constraint satisfaction problems in which different constraints must be fulfilled, like needed workforce per day, forbidden sequences of shifts, length of work and days-off blocks etc. There are two main variants of workforce schedules: rotating (or cyclic) workforce schedules and non-cyclic workforce schedules. In a rotating workforce schedule all empl...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2018