A Discrete Firefly Algorithm for the Scaffolding Modular Construction in Mega Projects

نویسندگان

  • J. J. Liu
  • L. Hou
چکیده

Productivity is critical to large and complex capital projects in sectors like infrastructure and resources. It normally relates to a significant scheduling issue when pursuing both time and cost objectives. A poor planning of project schedule might incur both excessive labour cost and project delay. Looking at scaffolding activity, a foremost and prerequisite construction activity for the subsequence LNG equipment erection, this study identifies the present research gaps: very limited research emphasis has been placed on the impact of design of time-cost optimization in scaffolding, as well as the feasible solutions. Therefore, the practical guidance in scaffolding construction planning is treated as a critical research focal point in this study. Modular construction of scaffolding has been extensively implemented in LNG projects due to the risks of working on offshore platform and the enormous working area. The emphasis of this study therefore is placed on addressing time-cost tradeoff problems (TCTPs) of scaffolding modular construction. In particular, the questions of how to resolve the relatively multi-objective optimization issues using the Firefly algorithm and how to model the time and cost objective functions under specified constrains are answered. It is concluded that this paper, for the first time, looks into the complexity of scaffolding scheduling and gives solutions using such a robust optimization algorithm. In parallel, a simulation case study has been carrying out to test this algorithm based solution, to see how it can help scaffolding planners develop practical project schedules in either cost effective or time saving manners, or other trade-offs in between.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A firefly algorithm for solving competitive location-design problem: a case study

This paper aims at determining the optimal number of new facilities besides specifying both the optimal location and design level of them under the budget constraint in a competitive environment by a novel hybrid continuous and discrete firefly algorithm. A real-world application of locating new chain stores in the city of Tehran, Iran, is used and the results are analyzed. In addition, several...

متن کامل

Multi-objective optimization of time-cost-quality-carbon dioxide emission-plan robustness in construction projects

Today, the construction industry is facing intense competition and success in this competition depends on several factors. Project managers try to minimize project time and cost, carbon dioxide emission and at the same time maximizing the quality of project and its plan robustness. In this paper, study construction project scheduling considering a discrete trade-off between time, cost, quality,...

متن کامل

The Role of RFID to Improve Materials Flow in Mega-projects Site

In according to quantity of various consumption materials in construction sites of complex projects such as oil industry, infrastructure, and large scale commercial, management and monitoring of materials can affect on the final time and cost of project’s activities. In today’s world of rising labor costs and labor shortages, automated materials tracking can provide some advantage to impr...

متن کامل

The Role of RFID to Improve Materials Flow in Mega-projects Site

In according to quantity of various consumption materials in construction sites of complex projects such as oil industry, infrastructure, and large scale commercial, management and monitoring of materials can affect on the final time and cost of project’s activities. In today’s world of rising labor costs and labor shortages, automated materials tracking can provide some advantage to impr...

متن کامل

Safety risk assessment and ranking in the construction projects with F.M.E.A and fuzzy T.O.P.S.I.S

Abstract Introduction: Construction projects are one of the most important sectors of the economy of the country, which has a high capacity for job creation. Construction projects are part of a huge and strategic set of civil engineering projects that unfortunately have a large share of work-related accidents due to lack of attention to safety. One of the most important issues that can contrib...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2014