Analyzing the Resource Perspective of Workflow Management Systems: Using a Meta Model and Constraints
نویسنده
چکیده
Workflow management systems support business processes and are driven by business processes models. These models cover different perspectives including the controlflow, resource, and data perspectives. Contemporary workflow management systems offer a wide variety of mechanisms to support the resource perspective. The resource perspective is essential for the applicability of workflow management systems. This paper focuses on the resource perspective, i.e., the way the system distributes work based on the structure of the organization and capabilities/qualifications of people. Our goal is to develop a structured and exact method to serve as aid for the analysis, evaluation and comparison of various workflow management systems. First we develop models of particular workflow management systems (Staffware, FileNet, and FLOWer). Next, we develop a meta model that can be seen as the “least common multiple” of system-specific workflow models. Finally, for each particular workflow management system we develop Object Constraint Language (OCL) expressions that constrain the meta model. Each of the three constrained meta models specifies the resource perspective of a particular system and can be used for further analysis.
منابع مشابه
Using Markov Chain to Analyze Production Lines Systems with Layout Constraints
There are some problems with estimating the time required for the manufacturing process of products, especially when there is a variable serving time, like control stage. These problems will cause overestimation of process time. Layout constraints, reworking constraints and inflexible product schedule in multi product lines need a precise planning to reduce volume in particular situation of lin...
متن کاملProject scheduling optimization for contractor’s Net present value maximization using meta-heuristic algorithms: A case study
Today's competitive conditions have caused the projects to be carried out in the least possible time with limited resources. Therefore, managing and scheduling a project is a necessity for the project. The timing of a project is to specify a sequence of times for a series of related activities. According to their priority and their latency, so that between the time the project is completed and ...
متن کاملProposing a Human Resource Balanced Scorecard based on Dynamic Systems Simulation s-based
Objective: The purpose of this study is to provide a dynamic system model for modeling the growth and learning perspective of a manufacturing company. The main focus of the model is on the company's human resources management process. Methods: In this study, an approach based on dynamic simulation has been proposed to evaluate the human resource condition. In order to do that, the researchers...
متن کاملA multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations
The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...
متن کاملResource Modeling in Workflow Applications
Collaborative applications such as workflow management systems separate between a process model and an organizational model. While the process modeling capabilities of current workflow management systems are at a high level, the organizational meta models provided by these systems are very often at a very elementary level. Moreover, most systems fail to provide means to integrate non-human acto...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2006