Resolution of Resource Conflict Between the Different Two Projects in MPL-CCPM Representation
نویسندگان
چکیده
Max-Plus-Linear (MPL) system is known as a solution for scheduling problems of a class of discrete event systems. Typical systems include: manufacturing system and project management, etc. In such systems, the initial schedule is frequently changed due to unpredictable disturbances. Critical Chain Project Management (CCPM) method is a management method that can shorten the time required to complete a project based on the Theory Of Constraints (TOC). Therefore, in our previous papers [1] [2], we proposed a method for applying the concepts of the CCPM to MPL representation in order to control the occurrence of an undesirable state change. The CCPM method also provides a solution for the problem of the resource conflict. However, we did not discuss the resource conflict for simplicity. In this paper, we propose a method for discovering resource conflict between the different two projects in the MPL-CCPM representation. We also discuss how to shift the resource in order to resolve the conflict. Key–Words: Max-Plus Algebra, Max-Plus-Linear system, Discrete Event Systems, Critical Chain Project Management, Resource Conflict, State-Space Representation, Scheduling.
منابع مشابه
Resolution of Resource Conflict for a Single Project in Max-Plus Linear Representation
This research proposes a method for resolving resource conflicts for a single project. We focus on the framework of resolving resource conflicts in the Critical Chain Project Management (CCPM), which is expressed in the form of Max-Plus Linear (MPL) system. Although the previous studies proposed a method for inserting time buffers, the problem of resource conflict has not been considered for si...
متن کاملResolution of Resource Contentions in the CCPM-MPL Using Simulated Annealing and Genetic Algorithm
This research aims to plan a “good-enough” schedule with leveling of resource contentions. We use the existing critical chain project management-max-plus linear framework. Critical chain project management is known as a technique used to both shorten the makespan and observe the due date under limited resources; the maxplus linear representation is an approach for modeling discrete event system...
متن کاملFuzzy Complexity Analysis with Conflict Resolution for Educational Projects
Evaluative and comparative analysis among educational projects remains an issue for administration, program directors, instructors, and educational institutes. This study reports a fuzzy complexity model for educational projects, which has two primary aspects (technical aspects and transparency aspects). These aspects may not be measured precisely due to uncertain situations. Therefore, a fuzzy...
متن کاملEffect of brief self-regulation couple therapy in conflict resolution and couple burnout
Unconstructive conflict resolution and couple burnout have a negative impact on quality of marital life. Brief self-regulation couple therapy is one of the effective approaches in transmission teachings and marital skills to couples. The aim of the current research was to investigate the effect of brief self-regulation couple therapy in conflict resolution and couple burnout among troubled coup...
متن کاملOPTIMIZATION OF MULTI PERIOD - MULTI LOCATION CONSTRUCTION PROJECTS CONSIDERING RESOURCE POOL AND BATCH ORDERING
During the past two decades, some industries have been moving towards project-centered systems in many modern countries. Therefore, managing simultaneous projects with considering the limitations in resources, equipment and manpower is very crucial. In the real world, project-based organizations are always facing with two main important features. First, the construction projects are decentraliz...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2010