Stability and Cost Optimization in Controlled Random Walks Using Scheduling Fields
نویسندگان
چکیده
The control of large queueing networks is a notoriously difficult problem. Recently, an interesting new policy design framework for the control problem called h-MaxWeight has been proposed: h-MaxWeight is a natural generalization of the famous MaxWeight policy where instead of the quadratic any other surrogate value function can be applied. Stability of the policy is then achieved through a perturbation technique. However, stability crucially depends on parameter choice which has to be adapted in simulations. In this paper we use a different technique where the required perturbations can be directly implemented in the weight domain, which we call a scheduling field then. Specifically, we derive the theoretical arsenal that guarantees universal stability while still operating ’close’ to the underlying cost criterion. Simulation examples suggest that the new approach to policy synthesis can even provide significantly higher gains irrespective of any further assumptions on the network model or parameter choice.
منابع مشابه
Three Hybrid Metaheuristic Algorithms for Stochastic Flexible Flow Shop Scheduling Problem with Preventive Maintenance and Budget Constraint
Stochastic flexible flow shop scheduling problem (SFFSSP) is one the main focus of researchers due to the complexity arises from inherent uncertainties and also the difficulty of solving such NP-hard problems. Conventionally, in such problems each machine’s job process time may encounter uncertainty due to their relevant random behaviour. In order to examine such problems more realistically, fi...
متن کاملScheduling in Container Terminals using Network Simplex Algorithm
In static scheduling problem, where there is no change in situation, the challenge is that the large problems can be solved in a short time. In this paper, the Static Scheduling problem of Automated Guided Vehicles in container terminal is solved by the Network Simplex Algorithm (NSA). The algorithm is based on graph model and their performances are at least 100 times faster than traditional si...
متن کاملProject scheduling optimization for contractor’s Net present value maximization using meta-heuristic algorithms: A case study
Today's competitive conditions have caused the projects to be carried out in the least possible time with limited resources. Therefore, managing and scheduling a project is a necessity for the project. The timing of a project is to specify a sequence of times for a series of related activities. According to their priority and their latency, so that between the time the project is completed and ...
متن کاملA Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm
In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...
متن کاملScheduling of Multiple Autonomous Guided Vehicles for an Assembly Line Using Minimum Cost Network Flow
This paper proposed a parallel automated assembly line system to produce multiple products having multiple autonomous guided vehicles (AGVs). Several assembly lines are configured to produce multiple products in which the technologies of machines are shared among the assembly lines when required. The transportation between the stations in an assembly line (intra assembly line) and among station...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- CoRR
دوره abs/1301.1917 شماره
صفحات -
تاریخ انتشار 2013