Generating Schedules to Maximize Quality

نویسندگان

  • Xiaofang Wang
  • Stephen F. Smith
چکیده

In knowledge generating production processes such as intelligence gathering and news reporting, the quality of the result produced by a given activity depends on its duration, and, due to resource limitations and process deadlines, tradeoffs must invariably be made regarding how much time to devote to various activities to achieve maximum overall effect. In essense, some activities must be executed in faster time cycles than would be desirable under non-constraining circumstances, with consequent degradation of process quality. In this paper, we consider this type of scheduling problem, which we refer to generally as quality maximization. Starting with normal resource-constrained project scheduling problem (RCPSP) assumptions, we define a new type of scheduling problem by additionally associating a quality profile with each activity in the project. Quality profiles have an “anytime” property, implying that activities can be terminated at any point, with the quality of the output being proportional to duration. Instead of finishing all activities as fast as possible, the goal of scheduling in this context is to maximize the overall quality given a hard project due date. We formulate this quality maximization problem as a constraint-based optimization problem, and present a new constraint posting algorithm for solving this problem that incorporates a linear optimization program. Different constraint posting heuristics are defined and evaluated on a set of quality maximization RCPSP problems constructed from standard reference RCPSP problems. The experimental results show the overall effectiveness of our approach for generating schedules to maximize quality. And ratio-based heuristics provide a promising starting point for stochastic sampling or other schedule refining techniques by solving 100% problems without backtracking.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Multi-Agent Management of Joint Schedules

In this paper, we describe an incremental scheduling framework designed to support joint management of inter-dependent schedules by multiple executing agents. We assume an uncertain execution environment and a distributed representation of the overall problem and schedule such that no single agent has a complete view. Hence as unexpected execution events force changes to individual agent schedu...

متن کامل

Incremental Scheduling to Maximize Quality in a Dynamic Environment

We present techniques for incrementally managing schedules in domains where activities accrue quality as a function of the time and resources allocated to them and the goal is to maximize the overall quality of actions executed over time. The scheduling problem of interest is both over-subscribed and dynamic; there is generally more to do than is possible within imposed deadlines, and opportuni...

متن کامل

Artificial Bee Colony Algorithm to Generator Maintenance Scheduling in Competitive Market

This paper proposes an Artificial Bee Colony (ABC) algorithm to Generator Maintenance Scheduling (GMS) in competitive market. In the regulated market the problem of generating optimal maintenance schedules of generating units for the purpose of maximizing economic benefits and improving reliable operation of a power system, subject to satisfying system constraints. In case of deregulated market...

متن کامل

OPTIMIZATION APPROACHES TO AIRLINE INDUSTRY CHALLENGES: Airline Schedule Planning and Recovery

The airline industry has a long history of developing and applying optimization approaches to their myriad of scheduling problems, including designing flight schedules that maximize profitability while satisfying rules related to aircraft maintenance; generating cost-minimizing, feasible work schedules for pilots and flight attendants; and identifying implementable, lowcost changes to aircraft ...

متن کامل

A New Approach Generating Robust and Stable Schedules in m-Machine Flow Shop Scheduling Problems: A Case Study

This paper considers a scheduling problem with uncertain processing times and machine breakdowns in industriall/office workplaces and solves it via a novel robust optimization method. In the traditional robust optimization, the solution robustness is maintained only for a specific set of scenarios, which may worsen the situation  for new scenarios. Thus, a two-stage predictive algorithm is prop...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2004