Robust scheduling to minimize the weighted number of late jobs with interval due-date uncertainty

نویسنده

  • Maciej Drwal
چکیده

We consider the class of single machine scheduling problems with the objective to minimize the weighted number of late jobs, under the assumption that completion due-dates are not known precisely at the time when decisionmaker must provide a schedule. It is assumed that only the intervals to which the due-dates belong are known. The concept of maximum regret is used to define robust solution. A polynomial time algorithm is given for the case when weights of jobs are all equal. A mixed-integer linear programming formulation is provided for the general case, and computational experiments are reported.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A branch and bound algorithm to minimize the total weighted number of tardy jobs and delivery costs with late deliveries for a supply chain scheduling problem

In this paper, we study a supply chain scheduling problem that simultaneously considers production scheduling and product delivery.  jobs have to be scheduled on a single machine and delivered to  customers for further processing in batches. The objective is to minimize the sum of the total weighted number of tardy jobs and the delivery costs. In this paper, we present a heuristic algorithm (HA...

متن کامل

Maximizing service level in a β-robust job shop scheduling model

In the realm of scheduling problems, different sources of uncertainty such as probabilistic durations of jobs or stochastic breakdowns of machines can arise. Given this, one highly desirable characteristic of an intelligent schedule is to bring better punctuality with less efficiency-loss because a dominant factor in customer appreciation is punctuality. It is also one of the most intangible to...

متن کامل

Parallel Jobs Scheduling with a Specific Due Date: Asemi-definite Relaxation-based Algorithm

This paper considers a different version of the parallel machines scheduling problem in which the parallel jobs simultaneously requirea pre-specifiedjob-dependent number of machines when being processed.This relaxation departs from one of the classic scheduling assumptions. While the analytical conditions can be easily statedfor some simple models, a graph model approach is required when confli...

متن کامل

Single Machine Preemptive Scheduling to Minimize the Weighted Number of Late Jobs with Deadlines and Nested Release/Due Date Intervals

This paper is devoted to the following version of the single machine preemptive scheduling problem of minimizing the weighted number of late jobs. A processing time, a release date, a due date and a weight of each job are given. Certain jobs are specified to be completed in time, i.e., their due dates are assigned to be deadlines, while the other jobs are allowed to be completed after their due...

متن کامل

SINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT

In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Computers & OR

دوره 91  شماره 

صفحات  -

تاریخ انتشار 2018