Integrated staffing and scheduling for an aircraft line maintenance problem
نویسندگان
چکیده
This paper presents a method for constructing the workforce schedules of an aircraft maintenance company. The method integrates both the staffing and the scheduling decision. We formulate the optimization problem using a mixed integer linear programming approach and solve it heuristically using a branch-and-bound enumeration framework. Each node of the tree represents a combination of teams and team sizes. An extensive computational experiment is added to illustrate the algorithmic performance using a set of test instances that are derived from a real-life setting. We conclude this paper by discussing some results and by addressing interesting future extensions to the model.
منابع مشابه
A Reliability based Modelling and Optimization of an Integrated Production and Preventive Maintenance Activities in Flowshop Scheduling Problem
Traditional scheduling problems with the batch processing machines (BPM) assume that machines are continuously available, and no time is needed for their preventive maintenance (PM). In this paper, we study a realistic variant of flowshop scheduling which integrates flow shop batch processing machines (FBPM) and preventive maintenance for minimizing the makespan. In order to tackle the given pr...
متن کاملIntegrated workforce staffing and scheduling A
Labor costs are amongst the most important costs for companies in highly developed countries. While manufacturers move their production units en masse to low wage countries, service companies are often tied to their current locations. Unlike production, the service surplus value is often directly related to the place where the service is provided. Moreover, service companies generally require m...
متن کاملImproving Workforce Scheduling of Aircraft Line Maintenance at Sabena Technics
This paper presents our application of a visualization tool and optimization model based on mixed-integer linear programming to solve a workforce staffing and scheduling problem at Sabena Technics, a major aircraft maintenance company in Belgium. We used the software to generate many alternative, cost-efficient schedules and to analyze multiple scenarios. In several management meetings, stakeho...
متن کاملCurrent Practices and Problem Areas in Aircraft Maintenance Planning and Scheduling – Interfaced/Integrated System Perspective
Aircraft maintenance planning and scheduling constitute planning, control and execution of materials (spare parts), operations (inspection, disassembly and assembly activities) and resources (labour, machines, transport equipment, etc.). This is a complex problem due to large number of components involved at various planning and execution levels, and the size/nature of resource-intensive mainte...
متن کاملMULTI-OBJECTIVE MATHEMATICAL MODELING OF AIRCRAFT LANDING PROBLEM ON A RUNWAY IN STATIC MODE, SCHEDULING AND SEQUENCE DETERMINATION USING NSGA-II
Runway length is usually a critical point in an airport system so, a great interest has been created for optimal use of this runway length. The most important factors in modeling of aircraft landing problem are time and cost while, the costs imposed on the system because of moving away from target times have different performances in terms of impact. In this paper, firstly, aircraft landing pro...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- Computers & OR
دوره 40 شماره
صفحات -
تاریخ انتشار 2013