Can Algorithms Support the Specification of Construction Schedules?

نویسنده

  • W Huhnt
چکیده

Construction processes require preparation phases where rules, agreements and arrangements for the execution of the project are discussed and determined. Detailed information is worked out where among others the construction activities are named and follow up charts are determined. In practice, follow up charts are developed that describe the project in different levels of detail. The quality of these follow up charts depends on the experiences of construction managers. The user has to specify the construction activities and their interdependencies. Some of these interdependencies are of technological nature. The technological interdependencies must be considered whereas other interdependencies, for example restrictions in the availability of resources, might be considered. Scheduling tools support construction managers with a wide range of functionalities, e.g. the critical path method (CPM) or load balancing algorithms. However, these tools do not support the user specifying interdependencies in such a way that completeness and correctness of interdependencies can be guaranteed. They document user input, and completeness and logical correctness of follow up charts can only be checked by inspection. This paper presents a modeling technique where the technological interdependencies between construction activities are treated as results of algorithms. Each construction activity is modeled individually and independently of other activities by describing its preconditions and its results. The interdependencies between activities are calculated from the activity-oriented specification based on relational algebra. A proposal for the order of activities is computed. However, rescheduling is still necessary to consider additional restrictions. The advantage in using the presented modeling technique is that logical correctness and completeness of the proposal can be guaranteed so that the quality of scheduling improves. A practical example is presented to illustrate how the modeling technique works and what results can be calculated to support work that is at present time specification work of construction managers. This paper describes the modeling technique in a context where specifically the use of this technique for construction scheduling is explained. Some more theoretical aspects have already been published (Huhnt, 2005). The approach presented in this paper is a new approach in the area of semi-automate approaches to generate construction schedules. Differences to existing approaches and advantages in contrast to existing approaches are described.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Establishing an Argument-Based Validity Approach for a Low-Stake Test of Collocational Behavior

Most of the validation studies conducted across varying test application contexts are usually framed within the traditional conceptualization of validity and therefore lack a comprehensive framework to focus on test score interpretations and test score use. This study aimed at developing and validating a collocational behavior test (CBT), drawing on Kane's argument-based approach to validity. F...

متن کامل

Scheduling of flexible manufacturing systems using genetic algorithm: A heuristic approach

Scheduling of production in Flexible Manufacturing Systems (FMSs) has been extensively investigated over the past years and it continues to attract the interest of both academic researchers and practitioners. The generation of new and modified production schedules is becoming a necessity in today’s complex manufacturing environment. Genetic algorithms are used in this paper to obtain an initial...

متن کامل

Can exposure to whole body vibration in operators of construction vehicles affect the prevalence of musculoskeletal disorders? A research study in construction projects

Operators of construction vehicles are constantly exposed to whole body vibration, which can lead to musculoskeletal disorders. The aim of present study was to evaluate the impact of exposure to whole body vibration in operators and its relation to musculoskeletal disorders. This study is a descriptive-analytical study. Using easy sampling, 89 operators from 6 types of heavy vehicles (Bulldoze...

متن کامل

A Neural Network Model Based on Support Vector Machine for Conceptual Cost Estimation in Construction Projects

Estimation of the conceptual costs in construction projects can be regarded as an important issue in feasibility studies. This estimation has a major impact on the success of construction projects. Indeed, this estimation supports the required information that can be employed in cost management and budgeting of these projects. The purpose of this paper is to introduce an intelligent model to im...

متن کامل

Construction cost estimation of spherical storage tanks: artificial neural networks and hybrid regression—GA algorithms

One of the most important processes in the early stages of construction projects is to estimate the cost involved. This process involves a wide range of uncertainties, which make it a challenging task. Because of unknown issues, using the experience of the experts or looking for similar cases are the conventional methods to deal with cost estimation. The current study presents data-driven metho...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2006