Scheduling arc maintenance jobs in a network to maximize total flow over time

نویسندگان

  • Natashia Boland
  • Thomas Kalinowski
  • Hamish Waterer
  • Lanbo Zheng
چکیده

We consider the problem of scheduling a set of maintenance jobs on the arcs of a network so that the total flow over the planning time horizon is maximized. A maintenance job causes an arc outage for its duration, potentially reducing the capacity of the network. The problem can be expected to have applications across a range of network infrastructures critical to modern life. For example, utilities such as water, sewerage and electricity all flow over networks. Products are manufactured and transported via supply chain networks. Such networks need regular, planned maintenance in order to continue to function. However the coordinated timing of maintenance jobs can have a major impact on the network capacity lost to maintenance. Here we describe the background to the problem, define it, prove it is strongly NP-hard, and derive four local search-based heuristic methods. These methods integrate exact maximum flow solutions within a local search framework. The availability of both primal and dual solvers, and dual information from the maximum flow solver, is exploited to gain efficiency in the algorithms. The performance of the heuristics is evaluated on both randomly generated instances, and on instances derived from real-world data. These are compared with a state-of-the-art integer programming solver.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Scheduling unit processing time arc shutdown jobs to maximize network flow over time: complexity results

We study the problem of scheduling maintenance on arcs of a capacitated network so as to maximize the total flow from a source node to a sink node over a set of time periods. Maintenance on an arc shuts down the arc for the duration of the period in which its maintenance is scheduled, making its capacity zero for that period. A set of arcs is designated to have maintenance during the planning p...

متن کامل

Scheduling arc shut downs in a network to maximize flow over time with a bounded number of jobs per time period

We study the problem of scheduling maintenance on arcs of a capacitated network so as to maximize the total flow from a source node to a sink node over a set of time periods. Maintenance on an arc shuts down the arc for the duration of the period in which its maintenance is scheduled, making its capacity zero for that period. A set of arcs is designated to have maintenance during the planning p...

متن کامل

Scheduling arc maintenance jobs in a network to maximize total flow over time ∗ Natashia Boland Thomas Kalinowski Hamish Waterer Lanbo Zheng

We consider the problem of scheduling a set of maintenance jobs on the arcs of a network so that the total flow over the planning time horizon is maximized. A maintenance job causes an arc outage for its duration, potentially reducing the capacity of the network. The problem can be expected to have applications across a range of network infrastructures critical to modern life. For example, util...

متن کامل

Scheduling unit time arc shutdowns to maximize network flow over time: Complexity results

We study the problem of scheduling maintenance on arcs of a capacitated network so as to maximize the total flow from a source node to a sink node over a set of time periods. Maintenance on an arc shuts down the arc for the duration of the period in which its maintenance is scheduled, making its capacity zero for that period. A set of arcs is designated to have maintenance during the planning p...

متن کامل

A New ILP Model for Identical Parallel-Machine Scheduling with Family Setup Times Minimizing the Total Weighted Flow Time by a Genetic Algorithm

This paper presents a novel, integer-linear programming (ILP) model for an identical parallel-machine scheduling problem with family setup times that minimizes the total weighted flow time (TWFT). Some researchers have addressed parallel-machine scheduling problems in the literature over the last three decades. However, the existing studies have been limited to the research of independent jobs,...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Discrete Applied Mathematics

دوره 163  شماره 

صفحات  -

تاریخ انتشار 2014