A Dynamic Model for Construction and Demolition (C&D) Waste Management in Spain: Driving Policies Based on Economic Incentives and Tax Penalties

نویسندگان

  • Nuria Calvo
  • Laura Varela-Candamio
چکیده

According to the recent Spanish legislation, the amount of non-hazardous construction and demolition waste (C&D waste) by weight must be reduced by at least 70% by 2020. However, the current behavior of the stakeholders involved in the waste management process make this goal difficult to achieve. In order to boost changes in their strategies, we firstly describe an Environmental Management System (EMS) based on regulation measures and economic incentives which incorporate universities as a key new actor in order to create a 3Rs model (Reduce, Reuse and Recycle) in the C&D waste management with costs savings. The target areas are focused mainly on producer responsibility, promotion of low-waste building technologies and creation of green jobs to fulfill three main objectives: valorization of inert wastes, elimination of illegal landfills and stimulation of demand for recycled C&D wastes. To achieve this latter goal, we have also designed a simulation model—using the Systems Dynamic methodology—to assess the potential impact of two policies (incentives and tax penalties) in order to evaluate how the government can influence the behavior of the firms in the recycling system of C&D waste aggregates. This paper finds a broader understanding of the socioeconomic implications of waste management over time and the positive effects of these policies in the recycled aggregates market in order to achieve the goal of 30% C&D waste aggregates in 12 years or less.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Waste Management of Building Ceramic Materials Using the DfD Technique: Sustainable Development and Environmentally Friendly

Nowadays, in modern societies, growing activities in construction affairs and their economic development have been resulted construction wastes and so much demolition in the past three decades. Most of these wastes have not been treated and therefore caused severe damages to the environment. In this research, after reviewing construction and demolition management methods and their accesso...

متن کامل

The Efficiency of Hybrid BNN-DWT for Predicting the Construction and Demolition Waste Concrete Strength

The current study focuses on two main goals. First, with the use of construction and demolition (C&D) of building materials, a new aggregate was produced and it was utilized for green concrete production. The compressive strength test confirmed the good function of C&DW aggregate concrete. This concrete did not show significant differences with natural sand concrete. Second, Backpropagation neu...

متن کامل

How Do You Identify the Best Practicable Environmental Option for Construction and Demolition Waste?

It has recently been estimated that 72 million tonnes of Construction and Demolition (C&D) waste arose in 1999 in England and Wales accounting for approximately 20% of total waste arisings. Of this 35% is estimated to be recycled. Improving the efficiency of the construction and demolition industry is a key objective for the UK Government, with the publication of a strategy for more sustainable...

متن کامل

Reverse logistics processes of multi-type end-of-life buildings/construction sites: An integrated optimization framework

A significant problem that has emerged in the field of construction and demolition waste management (C&D), involves the integrated optimization of the entire C&D waste supply chain. The critical decisions to be made include among others: (i) the determination of the optimal deconstruction depth for each EOL construction site before the demolition process, and (ii) the design of an effective tra...

متن کامل

A bi-level model for location-allocation problem of construction & demolition waste management under fuzzy random environment

In this paper, a location allocation (LA) problem in construction and demolition (C&D) waste management (WM) is studied. A bi-level model for this problem under a fuzzy random environment is presented where the upper level is the governments who sets up the processing centers, and the lower level are the administrators of different construction projects who control C&D waste and the after treat...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2014