Use Case 11 – End to End Testing of Protective Scheme

ثبت نشده
چکیده

Use Case Summary One of the functions required by utilities is the testing of protection schemes. Some schemes are quite simple and self-contained whereas other schemes involve many parts of this utility. This use case follows from the scheme design concepts through the analysis of the finished scheme. The objective is to stress the 61850/CIM interface to discover aspects of the “seams” which exist between these two standards. The CIM and 61850 must both be used at least at both ends of the process for this use case to be of practical use.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Fault Identification using end-to-end data by imperialist competitive algorithm

Faults in computer networks may result in millions of dollars in cost. Faults in a network need to be localized and repaired to keep the health of the network. Fault management systems are used to keep today’s complex networks running without significant cost, either by using active techniques or passive techniques. In this paper, we propose a novel approach based on imperialist competitive alg...

متن کامل

Fault Identification using end-to-end data by imperialist competitive algorithm

Faults in computer networks may result in millions of dollars in cost. Faults in a network need to be localized and repaired to keep the health of the network. Fault management systems are used to keep today’s complex networks running without significant cost, either by using active techniques or passive techniques. In this paper, we propose a novel approach based on imperialist competitive alg...

متن کامل

An Assessment Scheme for ELT Performance: An Iranian Case of Farhangian University

Accountability concerns in language education call for the development of more valid and authentic measures of assessment. In light of these concerns, performance assessment has received increasing interest in the context of teacher education programs and teacher licensing over the last decade. In Iran, a recent policy adopted by Farhangian University aims at assessing the professional competen...

متن کامل

Sub-cycle Overcurrent Protection for Self-clearing Faults Due to Insulation Breakdown

The first section of this paper discusses the self-clearing fault phenomena. The second section describes a universal protective relay architecture in which the sub-cycle overcurrent protection scheme has been implemented. The third section describes the protection scheme algorithm and implementation in the relay scheme. The fourth section covers testing of this scheme. An overall universal dis...

متن کامل

Digital Simulator Applications in Protective Relay Testing

This document discusses applications of digital simulators in protective relay testing with an emphasis on end-user evaluation and testing of relays in laboratory facilities. A background on digital simulators and transient testing together with a description of a twoterminal simulator test setup are given first. Description of a transmission network model and its use for generation of transien...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2009