The Effects of Student Syndrome, Stress, and Slack on Information Systems Development Projects

نویسنده

  • D. C. Smith
چکیده

This research attempts to identify how Agile systems development methodologies like SCRUM are affected by three behavioural issues student syndrome, team member stress and organisational slack. The student syndrome applies when humans start tasks as late as possible and waste safety margins thus increasing time pressure and stress levels. Stress can be both good and bad in a project situation. Stress levels that exceed an optimum level result in decreased performance and eventual burnout, whereas stress levels that were below a minimum level result in decreased performance. Organizational slack is a measure of “busyness” and is relates to staff being 100% scheduled. This is viewed as a short-term strategy which can negatively affect longer-term change and reinvention. These three issues can affect project productivity and project outcomes. This research analyses how these three behavioral issues affect plan-based development approaches and agile approaches (specifically SCRUM) in terms of team productivity and project outcomes. This paper describes these behavioural issues and how they could affect a typical systems development project. Four research questions were derived to be used in the next phase of the research. This next phase will identify a suitable student project which will be completed by an undergraduate student team using a traditional project approach at the same time as a post-graduate project team using SCRUM.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Measuring the Performance of the Virtual Teams in Global Software Development Projects

The development teams who are geographically spread, culturally mixed and mainly depend on information and communication technology (ICT) for communication is defined as a global virtual teams (GVTs). Despite the advancement of technologies, achieving the efficient performance of GVTs remains a challenge. The reviewed literature has highlighted the importance of training and development, organi...

متن کامل

The effect of the budget slack creation and budget internal control by managers on maximization of utility function in budgetary participation

When evaluating of the senior manager’s performance is based on the achieving to budget and they have responsibility to report the capacity of resources which are in their part too; it is possible to create budget slack and effect on their performance evaluation by providing pessimistic and conservatively estimates or manipulated information of income and expenses. So, Senior Manager and Budget...

متن کامل

Reducing rework and increasing the civil projects quality, through Total Quality Management (TQM), by using the concept of building information modeling (BIM)

One of the important problems in the field of Construction Industry is ‘rework’. It affects time, costs, quality, and almost every criteria of project success. As a result of rework and ineffective use of resources and materials in the workshops, there is always a considerable loss of resources, materials, investments, and workforce-time. Designing and planning through full awareness of clients...

متن کامل

Developing a Risk Management Model for Banking Software Development Projects Based on Fuzzy Inference System

Risk management is one of the most influential parts of project management that has a major impact on the success or failure of projects. Due to the increasing use of information technology (IT) systems in all fields and the high failure rate of IT projects in software development and production, it is essential to effectively manage these projects is essential. Therefore, this study is aimed t...

متن کامل

Constrained Renewable Resource Allocation in Fuzzy Metagraphs via Min-Slack

This paper discusses that the fuzzy metagraphs can be used as a tool for scheduling and control of fuzzy projects. Often, available resources for executing projects may be limited. It is assumed the resources required to accomplish each activity of project (metagraph edges) is renewable. One of the common methods for scheduling projects is using the min-slack. So, first, the forward and bac...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010