Scheduling Freight Trains in Rail-Rail Transshipment Yards

نویسندگان

  • Nils Boysen
  • Florian Jaehn
  • Erwin Pesch
چکیده

Transshipment yards, where gantry cranes allow for an e cient transshipment of containers between di erent freight trains, are important entities in modern railway systems and facilitate the general shift from point-to-point transport to hub-and-spoke railway systems. Modern rail-rail transshipment yards accelerate container handling, so that multiple smaller trains with equal destination can be consolidated to a reduced number of trains without jeopardizing on time deliveries. An important problem continuously arising during the daily operations of a transshipment yard is the train scheduling problem, which decides on the succession of trains at the parallel railway tracks. This problem with a special focus on resolving deadlocks and avoiding multiple crane picks per container move is investigated within the paper on hand. A mathematical program along with a complexity proof is provided and exact (Dynamic Programming) and heuristic (Beam Search) procedures are described.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

How to Park Freight Trains on Rail-Rail Transshipment Yards: The Train Location Problem

In modern rail-rail transshipment yards huge gantry cranes spanning all railway tracks allow for an e cient transshipment of containers between di erent freight trains. This way, multiple trains loaded with cargo for varying destinations can be consolidated to a reduced number of homogeneous trains, which is an essential requirement of hub-and-spoke railway systems. An important problem during ...

متن کامل

New bounds and algorithms for the transshipment yard scheduling problem

In a modern rail–rail transshipment yard huge gantry cranes transship containers between different freight trains, so that hub-and-spoke railway systems are enabled. In this context, we consider the transshipment yard scheduling problem (TYSP) where trains have to be assigned to bundles, which jointly enter and leave the yard. The objective is to minimize split moves and revisits. Split moves a...

متن کامل

Determining fixed Crane Areas in Rail-Rail Transshipment Yards

Rail-rail transshipment yards are an emerging and more e cient alternative to traditional shunting yards. Instead of a time-consuming reshu ing of railcars via shunting hills, in these modern yards, huge gantry cranes tranship containers between di erent freight trains. As multiple cranes process the trains in parallel, it is an important operational task to avoid interferences among cranes. To...

متن کامل

Determining crane areas in intermodal transshipment yards: The yard partition problem

At rail-road transshipment yards, gantry cranes move containers from freight trains to trucks and vice versa. They constitute important entities in today's intermodal transportation systems. Real-world yards are often partitioned into several disjunct crane areas, so that crane interferences during container transshipment are avoided. In practice, the lengths of such crane areas are typically d...

متن کامل

Hump Yard Track Allocation with Temporary Car Storage∗

In rail freight operation, freight cars need to be separated and reformed into new trains at hump yards. The classification procedure is complex and hump yards constitute bottlenecks in the rail freight network, often causing outbound trains to be delayed. One of the problems is that planning for the allocation of tracks at hump yards is difficult, given that the planner has limited resources (...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Transportation Science

دوره 45  شماره 

صفحات  -

تاریخ انتشار 2011