This thesis studies the approximability of scheduling problems in different contexts. Chapter 2 gives a short introduction to the field of scheduling theory and presents a simple single machine scheduling problem that will form the base for all variants considered in the remainder of this thesis. We point out that this scheduling problem, though long known to be efficiently solvable in its original form, becomes very interesting when additional restrictions are imposed. The restrictions in the focus of this thesis are precedence constraints among the jobs that need to be fulfilled by any feasible solution, or incomplete knowledge about the instance at hand. We first study the precedence constraint version of the above mentioned single machine scheduling problem. This problem was first studied in the seventies, and still poses perplexing questions to researchers, concerning its approximability. Throughout the years several 2-approximation algorithms have been developed for it, with some special cases of precedence constraints allowing for better than 2 approximations. It was recently shown that this scheduling problem is strongly related to the VERTEX COVER problem of an appropriately defined graph. We establish a connection between this graph and a well-known graph in Dimension Theory of partial orders. We also extend a technique developed by Dorit Hochbaum that yields “good” approximation algorithms for the INDEPENDENT SET problem in graphs to the case that the so-called fractional chromatic number of the graph is bounded. Using the connections to dimension theory, we devise an algorithmic framework that unifies and often improves on the best known approximation algorithms for all previously considered special cases of partial orders. Besides its success in devising approximation algorithms for special cases of precedence constraints, the above sketched connection is also interesting in its own right. As an example, the polynomial solvability of 2-dimensional precedence constraints can be explained by the fact that the resulting graph becomes bipartite and vertex cover is known to be polynomially solvable for bipartite graphs. We then study the above scheduling problems in the presence of uncertainty.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An improved genetic algorithm for multidimensional optimization of precedence-constrained production planning and scheduling

Integration of production planning and scheduling is a class of problems commonly found in manufacturing industry. This class of problems associated with precedence constraint has been previously modeled and optimized by the authors, in which, it requires a multidimensional optimization at the same time: what to make, how many to make, where to make and the order to make. It is a combinatorial,...

متن کامل

ROBUST RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH UNCERTAIN-BUT-BOUNDED ACTIVITY DURATIONS AND CASH FLOWS I. A NEW SAMPLING-BASED HYBRID PRIMARY-SECONDARY CRITERIA APPROACH

This paper, we presents a new primary-secondary-criteria scheduling model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations (UD) and cash flows (UC). The RCPSP-UD-UC approach producing a “robust” resource-feasible schedule immunized against uncertainties in the activity durations and which is on the sampling-based scenarios may be evaluated from a cos...

متن کامل

A note on the precedence-constrained class sequencing problem

We give a short proof of a result of Tovey [Non-approximability of precedence-constrained sequencing to minimize setups, DiscreteAppl. Math. 134:351–360, 2004] on the inapproximability of a scheduling problem known as precedence-constrained class sequencing. In addition, we present an approximation algorithm with performance guarantee (c + 1)/2, where c is the number of colors. This improves up...

متن کامل

Project Scheduling with Simultaneous Optimization, Time, Net Present Value, and Project Flexibility for Multimode Activities with Constrained Renewable Resources

Project success is assessed based on various criteria, every one of which enjoys a different level of importance for the beneficiaries and decision makers. Time and cost are the most important objectives and criteria for the project success. On the other hand, reducing the risk of finishing activities until the predetermined deadlines should be taken into account. Having formulated the problem ...

متن کامل

A multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations

The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010