A genetic algorithm approach for the time-cost trade-off in PERT networks
نویسندگان
چکیده
We develop a multi-objective model for the time-cost trade-off problem in PERT networks with generalized Erlang distributions of activity durations, using a genetic algorithm. The mean duration of each activity is assumed to be a non-increasing function and the direct cost of each activity is assumed to be a non-decreasing function of the amount of resource allocated to it. The decision variables of the model are the allocated resource quantities. The problem is formulated as a multi-objective optimal control problem that involves four conflicting objective functions. The objective functions are the project direct cost (to be minimized), the mean of the project completion time (min), the variance of the project completion time (min), and the probability that the project completion time does not exceed a certain threshold (max). It is impossible to solve this problem optimally. Therefore, we apply a ‘‘Genetic Algorithm for Numerical Optimizations of Constrained Problems’’ (GENOCOP) to solve this multi-objective problem using a goal attainment technique. Several factorial experiments are performed to identify appropriate genetic algorithm parameters that produce the best results within a given execution time in the three typical cases with different configurations. Finally, we compare the genetic algorithm results against the results of a discrete-time approximation method for solving the original optimal control problem. 2004 Elsevier Inc. All rights reserved. 0096-3003/$ see front matter 2004 Elsevier Inc. All rights reserved. doi:10.1016/j.amc.2004.10.021 * Corresponding author. E-mail address: [email protected] (A. Azaron). 1318 A. Azaron et al. / Appl. Math. Comput. 168 (2005) 1317–1339
منابع مشابه
A Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm
In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...
متن کاملA Multi Objective Fibonacci Search Based Algorithm for Resource Allocation in PERT Networks
The problem we investigate deals with the optimal assignment of resources to the activities of a stochastic project network. We seek to minimize the expected cost of the project include sum of resource utilization costs and lateness costs. We assume that the work content required by the activities follows an exponential distribution. The decision variables of the model are the allocated resourc...
متن کاملA New Heuristic Algorithm for Time-cost Trade-off Problem Taking into Account Monetary Value
Time-cost trade-off is one of the most important subjects in project management and of interest to contractors. The goal of time-cost trade-off is sensivity analysis of project costs to changes in activity duration in order to obtain the best combination of activity duration decrease, in a way that the sum of project costs is minimized. In the heuristics presented in this area, time crashing is...
متن کاملA New Heuristic Algorithm for Time-cost Trade-off Problem Taking into Account Monetary Value
Time-cost trade-off is one of the most important subjects in project management and of interest to contractors. The goal of time-cost trade-off is sensivity analysis of project costs to changes in activity duration in order to obtain the best combination of activity duration decrease, in a way that the sum of project costs is minimized. In the heuristics presented in this area, time crashing is...
متن کاملA New Approach to Approximate Completion Time Distribution Function of Stochastic Pert Networks
The classical PERT approach uses the path with the largest expected duration as the critical path to estimate the probability of completing a network by a given deadline. However, in general, such a path is not the most critical path (MCP) and does not have the smallest estimate for the probability of completion time. The main idea of this paper is derived from the domination structure between ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- Applied Mathematics and Computation
دوره 168 شماره
صفحات -
تاریخ انتشار 2005