Cooperative Planning, Uncertainty, and Managerial Control in Concurrent Design

نویسندگان

  • Victoria L. Mitchell
  • Barrie R. Nault
چکیده

We examine whether cooperative planning and uncertainty affect the magnitude of rework in concurrent engineering projects with upstream and downstream operations, and explore the impact of such rework on project delays. Using survey data from a sample of 120 business process (BP) redesign and related information technology (IT) development projects in healthcare and telecommunications, our results indicate upstream (BP) rework and downstream (IT) rework is mediated and mitigated by cooperative planning – through upstream/downstream strategy coupling and cross-functional involvement. In addition, uncertainty related to a lack of firm or industry experience with such projects increases the magnitude of upstream rework but not downstream rework or the amount of cooperative planning. After accounting for project scope, implementation horizon and whether delays are anticipated, we find that project delay is primarily influenced by the magnitude of downstream rework and downstream delay: the magnitude of both upstream and downstream rework significantly increases downstream delay, which significantly increases project delay. However, the magnitude of upstream rework does not directly affect project delay. These results suggest that project delay is under managerial control as cooperative planning is a managerial function that reduces downstream rework, while uncertainty from a lack of experience with the design affecting upstream rework is not directly under managerial control.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Government and Central Bank Interaction under Uncertainty: A Differential Games Approach

Abstract Today, debt stabilization in an uncertain environment is an important issue. In particular, the question how fiscal and monetary authorities should deal with this uncertainty is of much importance. Especially for some developing countries such as Iran, in which on average 60 percent of government revenues comes from oil, and consequently uncertainty about oil prices has a large effec...

متن کامل

Concurrent control on resource planning and revenue/expenditure estimation in large-scale shell material embankment projects management using discrete-event simulation

Resource planning in large-scale construction projects has been a complicated management issue requiring mechanisms to facilitate decision making for managers. In the present study, a computer-aided simulation model is developed based on concurrent control of resources and revenue/expenditure. The proposed method responds to the demand of resource management and scheduling in shell material emb...

متن کامل

Comparison of Cooperatives’ Members and Experts’ Views on Public Participation in Forestry and Rangeland By-Products (Case Study: Cooperative Companies, Lorestan Province, Iran)

This research was conducted to investigate the factors contributing to thefailure in the forestry and rangeland by-product cooperative companies in Lorestanprovince, Iran. A descriptive-correlative research design was used. The statisticalpopulations were 1100 people divided into two groups of experts from natural resourceagency in Lorestan province and members of cooperative companies. The sam...

متن کامل

A Robust Reliable Forward-reverse Supply Chain Network Design Model under Parameter and Disruption Uncertainties

Social responsibility is a key factor that could result in success and achieving great benefits for supply chains. Responsiveness and reliability are important social responsibility measures for consumers and all stakeholders that strategists and company managers should be concerned about them in long-term planning horizon. Although, presence of uncertainties as an intrinsic part of supply chai...

متن کامل

Integrated planning for blood platelet production: a robust optimization approach

Perishability of blood products as well as uncertainty in demand amounts complicate the management of blood supply for blood centers. This paper addresses a mixed-integer linear programming model for blood platelets production planning while integrating the processes of blood collection as well as production/testing, inventory control and distribution. Whole blood-derived production methods for...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Management Science

دوره 53  شماره 

صفحات  -

تاریخ انتشار 2007