Investment and Risk Management Analysis of Proactive as against Reactive Network Maintenance

نویسندگان

  • Lauri Forsman
  • Markku J. Penttinen
چکیده

This study analyses the factors affecting investment decisions concerning end-user support (EUS), which is even more complex than that of centralised data processing (DP). The alternatives of proactive and reactive end-user support (EUS) in a modern LAN environment are compared by analysing the failure risk of one specific component (HUB) of the LAN. The additional preventive actions and management costs are considered as well. Both proactive and reactive EUS are analysed in terms of investment and risk management. Arguments for and against enhanced support capability and a fault tolerant system structure are sought for optimising risk/spending levels. The reliability theory with its demand patterns demonstrated by electronic components has been used in the spirit of inventory-production theory in order to quantify the risk both with deterministic and random failure intensity parameters. Exact Bayesian tests have been developed in order to evaluate the two vendor MTBF figures, only the first of which turns out to match the observation. Bayesian posterior failure distributions have been estimated both in the deterministic and random failure intensity cases, the last of which results in a binomial distribution with an annual mean of 16 HUBs and a standard deviation of 4 HUBs. The cost parameters estimated by NOKIA from the field have been used, and the costs of alternative policies have been assessed. The annual expected reactive cost, with a lower hourly developer cost option of kFIM 563, exceeds the annual proactive cost of kFIM 552. An additional investment, i.e. systems for network monitoring equipment of kFIM 210 with a three-year pay-back period can be recommended. However, the expected reactive cost would not carry the investment where proactive policy would require an additional management effort compared with the reactive one. The additional preventive actions, costing kFIM 672 annually, could be covered only by assuming that developer capacity is a sales-limiting facxtor. Recommendations and sensitivity considerations can easily be provided for the day-to-day decision-making of IT and SBU management, using the developed calculation models with updated cost and failure statistics data. A key notion of the study is to develop a management tool for NOKIA’s DP management.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Investment Decision-Making about Portfolio of Technology Development Projects; Based on the Analysis of Success Criteria using Fuzzy Neural Network and MADM

Technology development project is a type of investment project and it is important to identify the performance indicators and planning for the correct investment. The purpose of this research is the development of indicators of portfolio success, accurate analysis of the effects of indicators on each other and the achievement of a proper investment model. In this research, the success criteria ...

متن کامل

Prioritization of Lean-production Components with Fuzzy Network Analysis: A Case Study (Sam Electric Co.)

The purpose of this research is to comprehend the different dimensions of the concept of lean in order to identify activities proportionate to the economic, cultural and organizational conditions in the industrial environment of the country, which regarding them, the position of the focus company was measured in the direction movement of leaning. This research was conducted among 15 experts and...

متن کامل

Mathematical Programming Approach To Allocate Local Or National Resources For Bridge Maintenance Rehabilitation & Replacement Planning (RESEARCH NOTE)

Today’s, the transportation facilities such as terminals, street, bridge, etc, represent the major investment in highway network. Every year tremendous resources should be invested to maintain these facilities. Among them, the Bridge Management System (B.M.S.) has been necessitated by large imbalance between extensive bridge repair and maintenance needs and limited available budget. So the main...

متن کامل

Towards modelling flood protection investment as a coupled human and natural system

Due to a number of recent high-profile flood events and the apparent threat from global warming, governments and their agencies are under pressure to make proactive investments to protect people living in floodplains. However, adopting a proactive approach as a universal strategy is not affordable. It has been argued that delaying expensive and essentially irreversible capital decisions could b...

متن کامل

Return on Investment in Transmission Network Expansion Planning Considering Wind Generation Uncertainties Applying Non-dominated Sorting Genetic Algorithm

Although significant private investment is absorbed in different sectors of power systems, transmission sector is still suffering from appropriate private investment. This is because of the pricing policies of transmission services, tariffs, and especially for investment risks. Investment risks are due to the uncertain behaviour of power systems that discourage investors to invest in the transm...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1998