Preemption Based Backfill
نویسندگان
چکیده
Recent advances in DNA analysis, global climate modeling and computational fluid dynamics have increased the demand for supercomputing resources. Through increasing the efficiency and throughput of existing supercomputing centers, additional computational power can be provided for these applications. Backfill has been shown to increase the efficiency of supercomputer schedulers for large, homogenous machines[3]. Utilizations can still be as low as 60% for machines with heterogeneous resources and strict administrative requirements. Preemption based backfill allows the scheduler to be more aggressive in filling up the schedule for a supercomputer[2]. Utilization can be increased and administrative requirements relaxed if it is possible to preempt a running job to allow a higher priority task to run.
منابع مشابه
Employing Checkpoint to Improve Job Scheduling in Large-Scale Systems
The FCFS-based backfill algorithm is widely used in scheduling high-performance computer systems. The algorithm relies on runtime estimate of jobs which is provided by users. However, statistics show the accuracy of user-provided estimate is poor. Users are very likely to provide a much longer runtime estimate than its real execution time. In this paper, we propose an aggressive backfilling app...
متن کاملProduction Job Scheduling for Parallel Shared Memory Systems
This paper addresses open job scheduling questions for the challenge workloads that run on the large scale parallel systems at supercomputer centers. Simulation results for six recent one-month job traces from the NCSA Origin 2000 (O2K) system are used to evaluate (1) the experimentally tuned NCSA LSF* policy, (2) the FCFS-backfill policy, (3) the Priority-backfill policy with alternative prior...
متن کاملScheduling a constellation of agile earth observation satellites with preemption
In this paper, we consider a scheduling problem for a set of agile Earth observation satellites for scanning different parts of the Earth’s surface. We assume that preemption is allowed to prevent repetitive images and develop four different preemption policies. Scheduling is done for the imaging time window and transmission time domain to the Earth stations as well. The value of each picture ...
متن کاملReliability analysis and design of backfill in a cut-and-fill mining method
In underground mining, hydraulic backfill materials, such as waste tailings, river sand, and cement, are often used to fill underground mined stopes. In cut-and-fill mining methods with blasthole stoping and delayed backfill, after extraction of adjacent pillars that contain economic minerals, the backfill is often subject to exposure of free standing on at least one side. A key concern for min...
متن کاملMine Backfill, an Operator's Guide. an Interactive Cd-rom for Mine Operators and Engineers
“Mine Backfill, An Operator’s Guide” is an extension of the electronic book on CD-ROM entitled “Mine Backfill 1998”, which was prepared for the CIM’s (Canadian Institute of Mining, Metallurgy, and Petroleum) centennial celebrations in 1999. Discussions with many operations revealed that there was an industry need for a backfill guide for front-line operator training and as a reference manual fo...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2002