Project Management System Based on Work-Breakdown-Structure Process Model

نویسندگان

  • Akira Harada
  • Satoshi Awane
  • Yuji Inoya
  • Osamu Ohno
  • Makoto Matsushita
  • Shinji Kusumoto
  • Katsuro Inoue
چکیده

We have developed a “WBS(Work Breakdown Structure) process model” for a business application software development project. We have also developed a project management system called “PRO-NAVI” which works on the “WBS process model.” This WBS process model” provides (1) mutual mapping between the “software development processes”, “activities”, “products”, “know-how,” “rules”, and “standards”, and provides (2) comprehensive control. The role of “project management” in a business application software development project is recognized to be of more importance. These projects generally involve huge efforts, and cost heavy payloads to their “project management.” Thus, an efficient project management system is needed. We have developed “PRO-NAVI”. We have applied and evaluated “PRO-NAVI” with a number of projects and confirmed that it is effective for efficient project fulfillment.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Simulation Based of Setting Policy in Project Acceptance Based on Experiences in Project-Driven SME's

The acceptance of the right project which leads to the realization of the set objectives is one of the most important issues in project-oriented companies. Therefore, corporate managers prefer to work on those projects which ensures the achievement of goals such as increasing financial profits or being the top brands in their rivals market. The present  research aimed at introducing  a systemat...

متن کامل

An optimal model for Project Risk Response Portfolio Selection (P2RPS) (Case study: Research institute of petroleum industry)

In the real world, risk and uncertainty are two natural properties in the implementation of Mega projects. Most projects fail to achieve the pre-determined objectives due to uncertainty. A linear integer programming optimization model was used in this work to solve a problem in order to choose the most appropriate risk responses for the project risks. A mathematical model, in which work structu...

متن کامل

A Project-Product Model-Based Approach to Planning Work Breakdown Structures of Complex System Projects

—Project planning practices employ various methods at various stages, with work breakdown structure (WBS) being a prominent starting point. Using WBS, the components and associated enabling products are often not explicitly expressed. We first introduce the notions of generic project construct and system build. Using a running example of a simplified unmanned aerial vehicle, we review the WBS m...

متن کامل

A Model-Based Approach for Planning Work Breakdown Structures of Complex Systems Projects

Planning the development efforts within large-scale projects is a highly complicated mission due to uncertainties regarding different aspects of the complex product to be delivered. Current planning practices employ a host of methods, including Work Breakdown Structure (WBS). Using WBS, the deliverable—the end product to be delivered, its components, and associated enabling products—are mostly ...

متن کامل

Modeling of Project Planning Architecture by Case-Based Method in System Analysis

A case-based method is important activity for variety system modeling in system architecture. The project planning management method and work breakdown structure is a reason why cost is wasted and a number of project planning is failed. It is necessary to develop a structure of work breakdown structure identification and output selection along to project's planning specificity in project planni...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2005