Status of the Pep-ii Transverse Feedback Systems*
نویسندگان
چکیده
The feedback systems for controlling transverse coupled-bunch instabilities in both the high and low energy rings of the PEP-II collider are complete and installed on site. Presently, the high energy ring of the collider is beginning commissioning. The commissioning of the high energy ring transverse feedback system is expected to begin sometime in the next few weeks. Design specifications and the basic system concept are reviewed. Selected bench-test results for various system components are discussed including results from the sumsignal orbit offset cancellation electronics.
منابع مشابه
Initial Commissioning Results from the Pep-ii Transverse Coupled-bunch Feedback Systems*
Initial commissioning results from the PEP-II transverse coupled-bunch feedback systems are discussed. In particular, the performance of key hardware and coupled-bunch damping results are described in some detail. Beam dynamics related measurements presented include beam transfer functions and selected modal growth and damping rates.
متن کاملThe PEP-II Project: Low-Energy Ring Design and Project Status
We describe the present status of the PEP-II project. The project comprises four major systems: Injector, High-Energy Ring (HER), Low-Energy Ring (LER), and Interaction Region (IR). We focus in detail on the design of the LER, as its parameters and requirements are most closely related to those required for the Beijing Tau-Charm Factory rings. The PEP-II LER is a high-current, 3.1-GeV positron ...
متن کاملNew Fast Dither System for Pep-ii*
The PEP-II B-Factory uses multiple feedback systems to stabilize the orbits of its stored beams and to optimize their performance in collision [1]. This paper describes an upgrade to the feedback system responsible for optimizing the overlap of colliding beams at the interaction point (IP). The effort was motivated by a desire to shorten the response time of the feedback, particularly in the co...
متن کاملThe Electron-cloud Instability in Pep-ii: an Update
We present an update on the estimate of the growth time of the multi-bunch transverse instability in the PEP-II collider arising from the interaction of the positron beam with the accumulated electron cloud. We estimate the contributions to the growth rate arising from the dipole magnets and from the pumping straight sections. We emphasize those quantities upon which the instability is most sen...
متن کاملMulti - Bunch Instability Diagnostics via Digital Feedback Systems at PEP - II , DA NE , ALS and SPEAR
Longitudinal feedback systems based on a common programmable DSP architecture have been commissioned at 4 laboratories. In addition to longitudinal feedback and beam diagnostics these exible systems have been programmed to provide diagnostics for tranverse motion. The diagnostic functions are based on transient domain techniques which record the response of every bunch while the feedback system...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 1998