A Multi-Period Renewal equipment problem
نویسندگان
چکیده
This paper looks at a Multi-Period Renewal equipment problem (MPR). It is inspired by a specific real-life situation where a set of hardware items is to be managed and their replacement dates determined, given a budget over a time horizon comprising a set of periods. The particular characteristic of this problem is the possibility of carrying forward any unused budget from one period to the next, which corresponds to the multi-periodicity aspect in the model. We begin with the industrial context and deduce the corresponding knapsack model that is the subject of this paper. Links to certain variants of the knapsack problem are next examined. We provide a study of complexity of the problem, for some of its special cases, and for its continuous relaxation. In particular, it is established that its continous relaxation and a special case can be solved in (strongly) polynomial time, that three other special cases can be solved in pseudo-polynomial time, while the problem itself is strongly NP-hard when the number of periods is unbounded. Next, two heuristics are proposed for solving the MPR problem. Experimental results and comparisons with the Martello&Toth and Dantzig heuristics, adapted to our problem, are provided.
منابع مشابه
OPTIMIZATION OF MULTI PERIOD - MULTI LOCATION CONSTRUCTION PROJECTS CONSIDERING RESOURCE POOL AND BATCH ORDERING
During the past two decades, some industries have been moving towards project-centered systems in many modern countries. Therefore, managing simultaneous projects with considering the limitations in resources, equipment and manpower is very crucial. In the real world, project-based organizations are always facing with two main important features. First, the construction projects are decentraliz...
متن کاملAn MILP approach to Multi-location, Multi-Period Equipment Selection for Surface Mining with Case Studies
In the surface mining industry, the Equipment Selection Problem involves choosing an appropriate fleet of trucks and loaders such that the long-term mine plan can be satisfied. An important characteristic for multi-location (multi-location and multi-dumpsite) mines is that the underlying problem is a multi-commodity flow problem. The problem is therefore at least as difficult as the fixed-charg...
متن کاملA multi-period fuzzy mathematical programming model for crude oil supply chain network design considering budget and equipment limitations
The major oil industry upstream activities include the exploration, drilling, extraction, pipelines installation, and production of crude oil. In this paper, we develop a mathematical model to plan for theseoperations as a crude oil supply chain network design problem.The proposed multi-period mixed integer linear programming model entails both strategic (e.g., facility location and allocation)...
متن کاملDynamic Multi Period Production Planning Problem with Semi Markovian Variable Cost (TECHNICAL NOTE)
This paper develops a method for solving the single product multi-period production-planning problem, in which the production and the inventory costs of each period arc concave and backlogging is not permitted. It is also assumed that the unit variable cost of the production evolves according to a continuous time Markov process. We prove that this production-planning problem can be Stated as a ...
متن کاملA Multi-Period 1-Center Location Problem in the Presence of a Probabilistic Line Barrier
This paper investigates a multi-period rectilinear distance 1-center location problem considering a line-shaped barrier, in which the starting point of the barrier follows the uniform distribution function. In addition, the existing points are sensitive to demands and locations. The purpose of the presented model is to minimize the maximum barrier distance from the new facility to the existing ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- European Journal of Operational Research
دوره 218 شماره
صفحات -
تاریخ انتشار 2012