Shielding Designs for the future FAIR project
نویسندگان
چکیده
Introduction In December 2003 GSI was given the first step of approval by the Hesse Ministry for environment to build the new international accelerator facility for beams of ions and antiprotons [1]. This approval was passed after the assessment by the radiation protection experts TÜV [2]. In order to meet the requirements to build the facilities for the FAIR project [3] shielding calculations have been performed using the radiation transport code FLUKA [4, 5]. Shielding calculations for the SIS300, for the antiproton production area and for the cave for compressed baryonic matter have already been performed (see [6, 7]).
منابع مشابه
Calculation of activation and dose spatial distributions induced by high intensity uranium beams at the Super-FRS fragment separator at FAIR
A calculation of activation and induced dose spatial distribution caused by 1.5 GeV/u U irradiation was carried out for the design of the shielding of the Super-FRS[1], which is under development for the future project at FAIR GSI. The calculation is based on a model newly developed in this study and it is divided into; (1) Residual nuclei calculation (2) activation calculation, (3) dose conver...
متن کاملتعیین ضریب عملکرد پروژه در مدیریت ارزش کسب شده با استفاده از مدیریت ریسک به منظور تخمین نتایج پایانی کار پیمانکاران
One of the common questions in all projects, is "How much would be the final cost of the project?" or "How much would be the completion duration of the project?". Earned Value Management presents a method for estimation of these results. In general methods and formula of Earned Value Management, future trend of project, are anticipated completely based on its previous trend, and changes in envi...
متن کاملMeasuring the Shielding Performance of Materials
Principles and applications are described for a new method for measuring the shielding performance of materials. The new method avoids the problems of common mode signal linkage to observations circuits, is fair to materials of various constructions and provides the basis for matching shielding performance to specific practical applications.
متن کاملMagnetic decoupling of the linac in a low field biplanar linac-MR system.
PURPOSE The integration of a low field biplanar magnetic resonance (MR) imager and linear accelerator (linac) causes magnetic interference at the linac due to the MR fringe fields. In order to eliminate this interference, passive and active magnetic shielding designs are investigated. METHODS The optimized design of passive magnetic shielding was performed using the finite element method. The...
متن کاملContemporary methods for evaluating complex project proposals
The ability to evaluate project proposals, assessing future success, and organizational value is critical to overall business performance for most enterprises. Yet, predicting project success is difficult and often unreliable. A four-year field study shows that the effectiveness of available methods for evaluating and selecting large, complex project depends on the specific project type, org...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2004