Exploratory case study research: Outsourced project failure

نویسندگان

  • June M. Verner
  • Lili Marziana Abdullah
چکیده

0950-5849/$ see front matter 2011 Published by doi:10.1016/j.infsof.2011.11.001 ⇑ Corresponding author. Address: School of Compu University, Staffordshire ST5 5BG, United Kingdom. T E-mail address: [email protected] (J.M. Vern Context: IT plays an increasingly strategic role in the business performance of organizations, however, the development of strategic IT systems involves a high degree of risk and outsourcing the development of such systems increases the risk. Objective: Using a case study approach we build on research that identifies risk factors leading to the failure of outsourced strategic IT development projects. We investigate the BSkyB project, a strategic development project, which was the subject of recent litigation in the British High Court. We wish to discover what factors led to the failure of such a high profile project; in particular we wish to identify which factors were under the control of the client. We also review the usefulness of the case study methodology when it is not possible to interview any of the people involved with a project. Method: Detailed-step-by-step guidelines designed for multiple industrial case studies are used to investigate the failure factors of the BSkyB project. We use transcripts of court proceedings and media reports to determine the failure factors. We compare the factors identified with those in a conceptual risk framework developed in prior research thus providing an initial validation of that framework. Results: The following factors were identified as problems in the BSkyB project: contract, requirements, project complexity, planning and control, execution, and team. A time and materials contract was a risk not originally included in the risk framework that we used. Conclusion: The BSkyB project failed because of problems that can be traced to both client and vendor. According to the judge’s summing up the major fault was with the vendor, although some problems did emanate from the client side. We found that many sections in the case study methodology we used were unnecessary for a single case study based on court proceedings and media reports. The risk framework helped with risk identification. 2011 Published by Elsevier B.V.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Exploring the Contribution of Problems in Team-Level Functionality to the Failure of Offshore-Outsourced Software Projects

Offshore outsourcing has been growing steadily since the 1990s, and this trend of sourcing services from low-cost countries such as India and China will continue in the near future. Despite the inherent challenges of offshore-outsourced software development (OOSD) projects, organizations in high-cost countries engage in OOSD projects because of compelling cost differences. We investigated the t...

متن کامل

Risk framework for outsourced strategic IT system development from the client perspective

While a series of risks connected with IT development and IT outsourcing are identified in the literature, research on risk in the context of strategic IT system development outsourcing is almost non-existent. This study investigates risks that are most likely to cause failure in a strategic IT system development outsourcing project, from the client perspective. This study examines strategic IT...

متن کامل

Outsourced Information Systems Failures in SMEs: a Multiple Case Study

Since the 1980s, a number of frameworks have been proposed for understanding the concept of information system (IS) failure. Two approaches to IS failures seem particularly important: the concept of Expectation Failure and the concept of Termination Failure. We argue that there is an extra dimension to the problem that is not covered by those descriptive models, which we call the Outsourced IS ...

متن کامل

Exploring Early Warning Signs Of Failure In Offshore-Outsourced Software Development Projects At The Team Level

Organizations face many challenges in executing offshore-outsourced software development (OOSD) projects involving several countries. In such contexts, complex software development efforts are exposed to a greater number of risks, which make OOSD projects prone to failures. We analyzed 19 cases of OOSD project failures to explore the concept of early warning signs (EWS) in OOSD projects at the ...

متن کامل

Agile requirements prioritization in large-scale outsourced system projects: An empirical study

The application of agile practices for requirements prioritization is a relatively recent trend. Hence, not all of its facets are well-understood. This exploratory study sets out to uncover the concepts that practitioners in a large software organization use in the prioritization process and the practices that they deem good. The study was carried out as a series of three embedded case studies ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Information & Software Technology

دوره 54  شماره 

صفحات  -

تاریخ انتشار 2012