Effective on-line algorithms for reliable due date quotation and large-scale scheduling
نویسندگان
چکیده
We consider the sequencing of a series of jobs that arrive at a single processor over time. At each job’s arrival time, a due date must be quoted for the job, and the job must complete processing before its quoted due date. The objective is to minimize the sum (or average) of quoted due dates, or equivalently, the average quoted lead time. In this paper, we propose on-line heuristics for this problem and characterize the conditions under which these heuristics are asymptotically optimal. Computational testing further demonstrates the relative effectiveness of these heuristics under various conditions.
منابع مشابه
Inventory positioning, scheduling and lead-time quotation in supply chains
We consider supply chain networks composed of several centrally managed production facilities as well as external suppliers. We design effective heuristics for inventory positioning, order sequencing, and short and reliable due-date quotation for this supply chain. We perform extensive computational testing to assess the effectiveness of our algorithms, and we explore the impact of supply chain...
متن کاملInventory Positioning, Scheduling and Due-Date Quotation in Supply Chains
We consider supply chain networks composed of several centrally managed production facilities as well as external suppliers. We design effective heuristics for inventory positioning, order sequencing, and short and reliable due date quotation for this supply chain. We perform extensive computational testing to assess the effectiveness of our algorithms, and we explore the impact of supply chain...
متن کاملCAREER: Scheduling of Large-Scale Systems: Probabilistic Analysis and Practical Algorithms for Due Date Quotation
We present a novel single facility due-date quotation model and algorithm, and characterize the effectiveness of this algorithm employing the tools of probabilistic analysis. This model is intended to be a building block for the models that we will use to analyze due date quotation in make-to-order supply chains, and we present a summary of these models.
متن کاملScheduling on flexible flow shop with cost-related objective function considering outsourcing options
This study considers outsourcing decisions in a flexible flow shop scheduling problem, in which each job can be processed by either an in-house production line or outsourced. The selected objective function aims to minimize the weighted sum of tardiness costs, in-house production costs, and outsourcing costs with respect to the jobs due date. The purpose of the problem is to select the jobs tha...
متن کاملScheduling and Due-Date Quotation in a Make-to-Order Supply Chain
We consider a manufacturer, served by a single supplier, who has to quote due dates to arriving customers in a maketo-order production environment. The manufacturer is penalized for long lead times and for missing due dates. To meet due dates, the manufacturer has to obtain components from a supplier. We model this manufacturer and supplier as a two-machine flow shop, consider several variation...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- J. Scheduling
دوره 11 شماره
صفحات -
تاریخ انتشار 2008