Genetic Algorithm for Large-Size Multi-Stage Batch Plant Scheduling

نویسندگان

  • Yaohua He
  • Chi-Wai Hui
چکیده

This paper presents a heuristic approach based on genetic algorithm (GA) for solving large-size multi-stage multi-product scheduling problem (MMSP) in batch plant. The proposed approach is suitable for different scheduling objectives, such as total process time, total flow time, etc. In the algorithm, solutions to the problem are represented by chromosomes that will be evolved by GA. A chromosome consists of order sequences corresponding to the processing stages. These order sequences are then assigned to processing units according to assignment strategies such as forward or backward assignment, active scheduling technique or similar measures, and some heuristic rules. All these measures greatly reduce unnecessary search space and increase the search speed. In addition, a penalty method for handling the constraints in the problem, e.g., the forbidden changeovers, is adopted, which avoids the infeasibility during the GA search and further greatly increases the search speed.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Genetic Based Scheduling Algorithm for the PHSP with Unequal Batch Size Inbound Trailers

This paper considers the parcel hub scheduling problem (PHSP) with unequal batch size inbound trailers, which is a combinatorial optimization problem commonly found in a parcel consolidation terminal in the parcel delivery industry (PDI). The problem consists of processing a large number of inbound trailers at a much smaller number of unload docks. The parcels in the inbound trailers must be un...

متن کامل

Role of batch size in scheduling optimization of flexible manufacturing system using genetic algorithm

Flexible manufacturing system (FMS) readily addresses the dynamic needs of the customers in terms of variety and quality. At present, there is a need to produce a wide range of quality products in limited time span. On-time delivery of customers’ orders is critical in make-to-order (MTO) manufacturing systems. The completion time of the orders depends on several factors including arrival rate, ...

متن کامل

A Two-Stage Hybrid Flowshop Scheduling Problem with Serial Batching

In this paper the problem of serial batch scheduling in a two-stage hybrid flow shop environment with minimizing Makesapn is studied. In serial batching it is assumed that jobs in a batch are processed serially, and their completion time is defined to be equal to the finishing time of the last job in the batch. The analysis and implementation of the prohibited transference of jobs among the mac...

متن کامل

A multi-objective genetic algorithm (MOGA) for hybrid flow shop scheduling problem with assembly operation

Scheduling for a two-stage production system is one of the most common problems in production management. In this production system, a number of products are produced and each product is assembled from a set of parts. The parts are produced in the first stage that is a fabrication stage and then they are assembled in the second stage that usually is an assembly stage. In this article, the first...

متن کامل

A heuristic approach for multi-stage sequence-dependent group scheduling problems

We present several heuristic algorithms based on tabu search for solving the multi-stage sequence-dependent group scheduling (SDGS) problem by considering minimization of makespan as the criterion. As the problem is recognized to be strongly NP-hard, several meta (tabu) search-based solution algorithms are developed to efficiently solve industry-size problem instances. Also, two different initi...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007