Plans are Nothing, Changing Plans is Everything: The Impact of Changes on Project Success
نویسندگان
چکیده
Based on a sample of 448 projects, the interactions between three planning variables, the Quality of Planning, Goal changes, Plan changes and Project Success are analyzed. The most important result of the study is that the amount of changes during a project’s implementation stands out as the only variable that distinguishes between successful and failed projects independent of their level of innovativeness. The study also reveals the interaction structure between the planning variables themselves and the resultant impact on project success, as well as several contextual variables, which affect the quality of planning and stimulate goal and plan changes.
منابع مشابه
Disclosure of the State of the Art of Performance Evaluation Applied to Project Management
This study aims to explore the subject of performance evaluation in project management through the selection of relevant articles on the theme and their subsequent bibliometric analysis, in order to build knowledge among researchers on the subject. The research is characterized as exploratory, descriptive, theoretical-illustrative and adopts ProKnow-C (Knowledge Development Process-Constructivi...
متن کاملEvaluation of Project Critical Success Factors for Key Construction Players and Objectives
Critical Success Factors (CSFs) are used to support and evaluate the success of a strategic and tactical approach in project implementation in order to increase the probability of success. This system is used by executors in project delivery to achieve improved performance capabilities with limited resources. The present paper aims to identify the impact of CSFs amongst the main elements involv...
متن کاملGood Governance, (as promoting in decision-making process) and its influence on urban strategic plans
Experiences from urban development plans and assessments of their concrete and tangible results in the past decades indicate lack of adequate success of our urbanization system to responding needs of our citizens. This has resulted in need to find a fundamental solution to transforming the centralized system into decentralized. Recent changes in regard to a change of approach from master plan t...
متن کاملModeling of Environmental Impact Assessment Based on RIAM and TOPSIS for Desalination and Operating Units
An environmental impact assessment is an assessment of the possible positive or negative impact that a proposed project may have on the environment, together consisting of the natural, social and economic aspects. Environmental Impact Assessment (EIA) of Masjid-I-Sulaiman desalination and operating unit’s project in the southern of Iran using Rapid Impact Assessment Matrix (RIAM) method is pre...
متن کاملبررسی تأثیر گسترش مراکز آموزش عالی بر کاربری فضاهای پیرامون آن در کلانشهر تبریز
The development of university centers is one of the causes of the modern physical alteration of cities and has a major impact on the development process of the city. This research studies the impact of university centers on changing and developing the use of spaces around Tabriz Metropolis. The research tools included observation and direct field studies, reviewing the maps of in 1968, 1996 and...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2003