Risk-adjusted monitoring of binary surgical outcomes.

نویسندگان

  • S H Steiner
  • R J Cook
  • V T Farewell
چکیده

A graphical procedure suitable for prospectively monitoring surgical performance is proposed. The approach is based on accumulating evidence from the outcomes of all previous surgical patients in a series using a new type of cumulative sum chart. Cumulative sum procedures are designed to "signal" if sufficient evidence has accumulated that the surgical failure rate has changed substantially. In this way, the chart rapidly detects deterioration (or improvement) in surgical performance while not overreacting to the expected fluctuations due to chance. Through the use of a likelihood-based scoring method, the cumulative sum procedure is adapted so that it adjusts for the surgical risk of each patient estimated preoperatively. The procedure is therefore applicable in situations where it is desirable to adjust for a mix of patients. Signals of the chart lead to investigations of the cause and to the timely introduction of remedial measures designed to avoid unnecessary future failures.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Phase I Risk-Adjusted Control Charts for Monitoring Surgical Performance by Considering Categorical Covariates

In recent years risk-adjusted control charts have been increasingly studied for monitoring surgical outcomes by accounting for patients’ health conditions prior to surgery. However, most existing research focuses on phase II monitoring, and very little work has been done on phase I control of surgical outcomes. In this paper, a general phase I risk-adjusted control chart is proposed for monitor...

متن کامل

Risk-adjusted control charts based on LR-fuzzy data

Control charts are widely used in industrial processes as well as in health sciences and particularly for monitoring the performance of cardiac surgeon or a group of surgeons based on the preoperative risk of patients. Since the preoperative risk is a vague and nonprecise variable and the anesthesiologists after checking how many risk factors a patient has, determine the risk of mortality befor...

متن کامل

A risk adjusted self-starting Bernoulli CUSUM control chart with dynamic probability control limits

Usually, in monitoring schemes the nominal value of the process parameter is assumed known. However, this assumption is violated owing to costly sampling and lack of data particularly in healthcare systems. On the other hand, applying a fixed control limit for the risk-adjusted Bernoulli chart causes to a variable in-control average run length performance for patient populations with dissimilar...

متن کامل

Bayesian Estimation of Change Point in Phase One Risk Adjusted Control Charts

Use of risk adjusted control charts for monitoring patients’ surgical outcomes is now popular.These charts are developed based on considering the patient’s pre-operation risks. Change point detection is a crucial problem in statistical process control (SPC).It helpsthe managers toanalyzeroot causes of out-of-control conditions more effectively. Since the control chart signals do not necessarily...

متن کامل

Risk-adjusted survival time monitoring with an updating exponentially weighted moving average (EWMA) control chart.

Monitoring medical outcomes is desirable to help quickly detect performance changes. Previous applications have focused mostly on binary outcomes, such as 30-day mortality after surgery. However, in many applications the survival time data are routinely collected. In this paper, we propose an updating exponentially weighted moving average (EWMA) control chart to monitor risk-adjusted survival t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Medical decision making : an international journal of the Society for Medical Decision Making

دوره 21 3  شماره 

صفحات  -

تاریخ انتشار 2001