An integrated production and inventory model for a whole manufacturing supply chain involving reverse logistics with finite horizon period

نویسنده

  • D. Z. Zhang
چکیده

This paper proposes a model and solution method for coordinating integrated production and inventory cycles in a whole manufacturing supply chain involving reverse logistics for multiple items with finite horizon period. A whole manufacturing supply chain involving reverse logistic consists of tier-2 suppliers supplying raw materials to tier-1 suppliers, tier-1 suppliers producing parts, a manufacturer which manufactures and assembles parts from tier-1 suppliers into finished products, distributors distributing finished products to retailers, retailers selling products to end customers and a third party which collects the used finished products from end customers, dissembles collected products into parts, and feed the parts back to the supply chain. In this system, we consider a finite horizon period. A mathematical model for representing the behaviors of the system is developed. Solution methods based on decentralized and a combination of decentralized and centralized decision making process, referred to as the semi-centralized decision making process, are proposed to solve the model while the centralized decision making process is solved by a mixed integer nonlinear programming method. A numerical example is used to demonstrate the model and the solutions based on the three types of the coordination. & 2012 Elsevier Ltd. All rights reserved.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Considering chain to chain competition in forward and reverse logistics of a dynamic and integrated supply chain network design problem

In this paper, a bi-objective model is presented for dynamic and integrated network design of a new entrant competitive closed-loop supply chain. To consider dynamism and integration in the network design problem, multiple long-term periods are regarded during planning horizon, so that each long-term period includes several short-term periods. Furthermore, a chain to chain competition between t...

متن کامل

A reverse logistics chain mathematical model for a sustainable production system of perishable goods based on demand optimization

Sustainability in the supply chain means pushing the supply chain to focus on social, economic and environmental aspects, and addressing the existing problems in the traditional supply chain. Considering the importance of evaluating supply chain networks, especially in the field of perishable commodities, this paper aimed to design a mathematical model for the reverse supply chain of perishable...

متن کامل

Considering Pricing Problem in a Dynamic and Integrated Design of Sustainable Closed-loop Supply Chain Network

Flexible and dynamic supply chain network design problem has been studied by many researchers during past years. Since integration of short-term and long-term decisions in strategic planning leads to more reliable plans, in this paper a multi-objective model for a sustainable closed-loop supply chain network design problem is proposed. The planning horizon of this model contains multiple strate...

متن کامل

A Complex Design of the Integrated Forward-Reverse Logistics Network under Uncertainty

Design of a logistics network in proper way provides a proper platform for efficient and effective supply chain management. This paper studies a multi-period, multi echelon and multi-product integrated forward-reverse logistics network under uncertainty. First, an efficient complex mixed-integer linear programming (MILP) model by considering some real-world assumptions is developed for the inte...

متن کامل

Integrated Inventory Model with Controllable Lead Time Involving Investment for Quality Improvement in Supply Chain System

The purpose of this article is to investigate a two-echelon supply chain inventory problem consisting of a single-vendor and a single-buyer with controllable lead time and investment for quality improvements. This paper presents an integrated vendor-buyer inventory model in order to minimize the sum of the ordering cost, holding cost, setup cost, investment for quality improvement and crashing ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015