Customer order scheduling on a single machine with family setup times: Complexity and algorithms
نویسندگان
چکیده
We consider a situation where C customers each order various quantities (possibly zero in some cases) of products from P different families, which can be produced on a continuously available machine in any sequence (requiring a setup whenever production switches from one family to another). We assume that the time needed for a setup depends only on the family to be produced immediately after it, and we follow the item availability model (which implies that all units are ready for dispatch as soon as they are produced). However, an order is shipped only when all units required by a customer are ready. The time from the start (time zero) to the completion of a customer order is called the order lead time. The problem, which restates the original description of the customer order scheduling problem, entails finding a production schedule that will minimize the total order lead time. While this problem has received some attention in the literature, its complexity status has remained vexingly open. In this note, we show for the first time that the problem is strongly NP-hard. We proceed to give dynamic programming based exact solution algorithms for the general problem and a special case (where C is fixed). These algorithms allow us to solve small instances of the problem and understand the problem complexity more fully. In particular, the solution of the special case shows that the problem is solvable in polynomial time when C is fixed. 2006 Elsevier Inc. All rights reserved.
منابع مشابه
A New ILP Model for Identical Parallel-Machine Scheduling with Family Setup Times Minimizing the Total Weighted Flow Time by a Genetic Algorithm
This paper presents a novel, integer-linear programming (ILP) model for an identical parallel-machine scheduling problem with family setup times that minimizes the total weighted flow time (TWFT). Some researchers have addressed parallel-machine scheduling problems in the literature over the last three decades. However, the existing studies have been limited to the research of independent jobs,...
متن کاملCustomer Order Scheduling with Job-Based Processing and Lot Streaming In A Two-Machine Flow Shop
This paper considers a customer order scheduling (COS) problem in which each customer requests a variety of products processed in a two-machine flow shop. A sequence-independent attached setup for each machine is needed before processing each product lot. We assume that customer orders are satisfied by the job-based processing approach in which the same products from different customer orders f...
متن کاملTwo meta-heuristic algorithms for parallel machines scheduling problem with past-sequence-dependent setup times and effects of deterioration and learning
This paper considers identical parallel machines scheduling problem with past-sequence-dependent setup times, deteriorating jobs and learning effects, in which the actual processing time of a job on each machine is given as a function of the processing times of the jobs already processed and its scheduled position on the corresponding machine. In addition, the setup time of a job on each machin...
متن کاملSingle-machine scheduling considering carryover sequence-dependent setup time, and earliness and tardiness penalties of production
Production scheduling is one of the very important problems that industry and production are confronted with it. Production scheduling is often planned in the industrial environments while productivity in production can improve significantly the expansion of simultaneous optimization of the scheduling plan. Production scheduling and production are two areas that have attracted much attention in...
متن کاملSolving Group Scheduling Problem in No-wait Flow Shop with Sequence Dependent Setup Times
Different manufacturing enterprises use regularly scheduling algorithms in order to help meeting demands over time and reducing operational costs. Nowadays, for a better useofresources and manufacturingin accordance withcustomer needs and given the level ofcompetitionbetweencompanies, employing asuitablescheduling programhasa double importance. Conventional productionmethods are constantly subs...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- Applied Mathematics and Computation
دوره 185 شماره
صفحات -
تاریخ انتشار 2007