The Optional Value of IS Projects - a Study of an IS Portfolio at a Multinational Manufacturer
نویسندگان
چکیده
The IS research literature has tested the applicability of option pricing models to IS projects mostly through detailed case studies. The current study complements this literature by considering a wide set of IS projects and assessing, albeit crudely, their optional value. We test the literature’s assumption that IS projects embed significant optional value. Our research site is a European plant of a leading multinational manufacturer of sophisticated products. The portfolio of current and recent IS projects is studied through a questionnaire administered to all project managers. Seventeen project managers were interviewed concerning thirty-one projects with median cost of $325k and median benefit of $1.2m. We find strong support to the prediction that IS projects include considerable optional value. The thirty one projects we studied embed forty seven options, many of them with benefits comparable to the value of the original projects. Only four projects had no optional value. A comparison between a subset of the portfolio and the corresponding scale-up options shows that the exercise price of the options is 20% of the original projects’ cost, and that the value of these options is about 70% of the original projects’ value. This data also demonstrates the large return, of scale-up options – the median return is 1500%, five fold the median return of projects. The main practical implication of this study is that real option evaluation is useful for IS projects in general, and should not be confined to special cases. A further implication is that real option thinking may be of particular value in recognising reduction and deferral options. The project managers in our study found such options difficult to identify and considered their time to expiration as relatively short. Proactive management of reduction and deferral options should thus increase the flexibility and value of IS projects.
منابع مشابه
Multi-criteria approach to project portfolio selection considering structural hardness and correlations between projects
Project portfolio selection is very important subject of decision-makers in project-based organizations. The best assignment of resources to the most appropriate projects is necessary as financing projects with low benefit is just waste of organization's resources. However, existing project selection models pay not much attention the structure and special features of projects as a selection cri...
متن کاملA Fuzzy Approach for Projects Evaluation and Selection an Iranian Auto Manufacturer Case Study
Evaluating and selecting alternatives investment projects needs considering all relevant and important aspects. In traditional methods, the focus is just on tangible monetary criteria. Also in the traditional methods, either all the information’s about factors must be known precisely or sufficient objective data must be available for applying probability theory. In this paper, a combinative app...
متن کاملAn optimal model for Project Risk Response Portfolio Selection (P2RPS) (Case study: Research institute of petroleum industry)
In the real world, risk and uncertainty are two natural properties in the implementation of Mega projects. Most projects fail to achieve the pre-determined objectives due to uncertainty. A linear integer programming optimization model was used in this work to solve a problem in order to choose the most appropriate risk responses for the project risks. A mathematical model, in which work structu...
متن کاملIntroducing the Time Value of Money in a Non-consignment Vendor Managed Inventory Model
Vendor managed inventory (VMI) is an integrated approach for buyer–vendor coordination, according to which the vendor (supplier or manufacturer) decides on the appropriate buyer’s (retailer’s) inventory levels. The time value of money has not traditionally been considered in evaluating VMI supply chain’s total inventory cost in any studies up to now. Therefore, in the present study a new model ...
متن کاملA stochastic model for project selection and scheduling problem
Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2002