Multi-Range Robust Optimization vs Stochastic Programming in Prioritizing Project Selection

نویسندگان

  • Ruken Düzgün
  • Aurélie Thiele
چکیده

This paper describes a multi-range robust optimization approach applied to the problem of capacity investment under uncertainty. In multi-range robust optimization, an uncertain parameter is allowed to take values from more than one uncertainty range. We consider a number of possible projects with anticipated costs and cash flows, and an investment decision to be made under budget limitations. Uncertainty in parameter values – in our case, the cost and net present values of each project – could significantly impede the real-life viability of the suggested investment plan. We set up the multi-range robust optimization so that the possible values taken by the uncertain parameters match the three possible values of the cost or net present value distributions in the stochastic programming approach that we use as benchmark. While the stochastic programming approach suffers from tractability issues, the robust optimization approach solves the same capacity investment problem in seconds. We also show how to compute the project prioritization list to substantially decrease computation time.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A robust multi-objective global supplier selection model under currency fluctuation and price discount

Robust supplier selection problem, in a scenario-based approach has been proposed, when the demand and exchange rates are subject to uncertainties. First, a deterministic multi-objective mixed integer linear programming is developed; then, the robust counterpart of the proposed mixed integer linear programming is presented using the recent extension in robust optimization theory. We discuss dec...

متن کامل

A stochastic model for project selection and scheduling problem

Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...

متن کامل

Multi-period project portfolio selection under risk considerations and stochastic income

This paper deals with multi-period project portfolio selection problem. In this problem, the available budget is invested on the best portfolio of projects in each period such that the net profit is maximized. We also consider more realistic assumptions to cover wider range of applications than those reported in previous studies. A novel mathematical model is presented to solve the problem, con...

متن کامل

Using Genetic Algorithm in Solving Stochastic Programming for Multi-Objective Portfolio Selection in Tehran Stock Exchange

Investor decision making has always been affected by two factors: risk and returns. Considering risk, the investor expects an acceptable return on the investment decision horizon. Accordingly, defining goals and constraints for each investor can have unique prioritization. This paper develops several approaches to multi criteria portfolio optimization. The maximization of stock returns, the pow...

متن کامل

Demand-oriented timetable design for urban rail transit under stochastic demand

In the context of public transportation system, improving the service quality and robustness through minimizing the average passengers waiting time is a real challenge. This study provides robust stochastic programming models for train timetabling problem in urban rail transit systems. The objective is minimization of the weighted summation of the expected cost of passenger waiting time, its va...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2012