Project Cash Flow Forecasting: a Mathematical Approach

نویسنده

  • Farzad Khosrowshahi
چکیده

A proactive approach to project cash flow management relies heavily on the use of a forecasting model that is, on the one hand, capable of generating reasonably accurate forecasts and, on the other hand, offers the flexibility which enables the financial manager to challenge the outcome of the forecast in the direction of corporate financial objectives of the organization. The latter was the subject of a paper in the previous ARCOM conference. This paper is concerned with the former: the structure of the project cash flow forecasting model. The paper provides the details of the model, which consists of a mathematical expression, and a database of processed data relating to project expenditure flows of a variety of construction projects. The methodology used for the development of the model is based on the analysis of the shape of the project expenditure profile. The understanding of the shape-geometry of the profile and the identification of the variables that define the profile will in turn help to construct the profile for any given project definition. This undertaking also relies on the use of a mathematical model in order to convert the shape-variables into an expenditure pattern. Therefore, the paper discusses the components of the mathematical model, which consists of three modules each responsible for implementing a number of requirements relating to shapevariables.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Assessment Method for Project Cash Flow under Interval-Valued Fuzzy Environment

Effective project management requires reliable knowledge of cash required in different stages of project life cycle. Getting this knowledge is highly dependent on sophisticated consideration of project environment. Nature of projects and their environments are associated with uncertain conditions. In this paper, a new project cash flow assessment method based on project scheduling is proposed t...

متن کامل

A New Uncertain Modeling of Production Project Time and Cost Based on Atanassov Fuzzy Sets

  Uncertainty plays a major role in any project evaluation and management process. One of the trickiest parts of any production project work is its cost and time forecasting. Since in the initial phases of production projects uncertainty is at its highest level, a reliable method of project scheduling and cash flow generation is vital to help the managers reach successful implementation of the ...

متن کامل

An Assessment of Risk Factors Involved in Modelling Cash Flow Forecasting

Many models have been developed to assist contractors and clients in their cash flow forecasting. The majority of these have been based on standard cash flow S-curves, developed using the traditional manual approach, mathematical and statistical models. Many of these models failed to consider and analyse the factors responsible for the considerable variations in the modelled cash flow profiles....

متن کامل

Prediction of project cash flow using time-depended evolutionary LS-SVM inference model

Purpose The ability to predict cash demand is crucial for the operation of construction companies. Reliable cash flow prediction during the execution phase can help managers to avoid cash shortages and to control project cash flow effectively. Method This paper presents a new inference model, CF-ELSIMT, for cash flow forecasting. The developed CF-ELSIMT utilizes weighted Least Squares Support V...

متن کامل

ROBUST RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH UNCERTAIN-BUT-BOUNDED ACTIVITY DURATIONS AND CASH FLOWS II. SOUNDS OF SILENCE: A NEW SAMPLING-BASED HYBRID PRIMARY-SECONDARY CRITERIA HARMONY SEARCH METAHEURISTIC

In this paper, we present a new idea for robust project scheduling combined with a cost-oriented uncertainty investigation. The result of the new approach is a makespan minimal robust proactive schedule, which is immune against the uncertainties in the activity durations and which can be evaluated from a cost-oriented point of view on the set of the uncertain-but-bounded duration and cost param...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2004