Measuring and Modeling Suspended Sediment Yields in Urbanizing Georgia Piedmont Watersheds

نویسندگان

  • J. S. Sholtes
  • L. Visone
  • E. A. Lewallen
  • L. Hawks
چکیده

This paper presents a comparison of U.S. Geological Survey stream monitoring station measurements of total suspended solids (TSS) yield and stream bank erosion monitoring data with a suspended solids model developed by Brown and Caldwell and used by the Gwinnett County, Georgia Department of Water Resources (DWR) to inform its watershed improvement efforts. A comparison between modeled and average measured TSS yield results at each gauging station indicates that a reasonable match exists over the majority of compared watersheds. When removing two stations with less than five years of data (coinciding with a drought of record) and two outlier stations, the average absolute percent difference between modeled and measured results is 20.1%, which is within the sampling error associated with TSS measurements. In general, the model tends to over predict TSS yield. It assumes a streambank TSS loading rate of 12 lbs/ft/yr per unit area of exposed bank as quantified in the field. Six years of measured streambank erosion rates has documented an average annual production of 7.1 lbs/ft/yr. The average measured TSS yields at two stations were substantially less than the modeled values. It is thought that other factors are influencing TSS export such as the age of build out conditions. A discussion is presented addressing the potential reasons for the divergence between modeled and measured results as well as the potential for model calibration.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Sediment fingerprinting to determine the source of suspended sediment in a southern Piedmont stream.

Thousands of stream miles in the southern Piedmont region are impaired because of high levels of suspended sediment. It is unclear if the source is upland erosion from agricultural sources or bank erosion of historic sediment deposited in the flood plains between 1830 and 1930 when cotton farming was extensive. The objective of this study was to determine the source of high stream suspended sed...

متن کامل

Effects of Timber Harvest on Water Quantity and Quality in Small Watersheds in the Piedmont of North Carolina

This paired watershed study tested the effects of timber harvest on water quantity and quality in the North Carolina Piedmont physiographic region. Four headwater watersheds at Hill Demonstration Forest (HF1, HF2, HFW1, and HFW2) and two at Umstead Research Farm (UF1 and UF2) were continuously monitored for discharge and water quality from 2007 to 2013. The HF1 and UF1 watersheds were clearcut ...

متن کامل

Contribution of stream channel erosion to sediment yield from an urbanizing watershed

Stream channel erosion has long been suspected as the major contributor to long-term sediment yield from urbanizing watersheds. For San Diego Creek in southern California, measurements from 1983 to 1993 showed that stream channel erosion furnished 10(5) megagrams per year of sediment, or about two-thirds of the total sediment yield. Thus, because channel erosion can be a major source of sedimen...

متن کامل

The Effects of Stream Crossings on Total Suspended Sediment in North Carolina Piedmont Forests

This study determined total suspended sediment (TSS) at six stream crossings that represented a range of site conditions and forest operations in the Piedmont of North Carolina. Two wood and three steel bridgemats and one culvert were installed to cross the streams. The road classes for the crossings included four temporary skid trails and two permanent forest haul roads. Baseflow and stormflow...

متن کامل

Choosing the Best Hierarchical Clustering Technique Based on Principal Components Analysis for Suspended Sediment Load Estimation

1- INTRODUCTION The assessment of watershed sediment load is necessary for controling soil erosion and reducing the potential of sediment production. Different estimates of sediment amounts along with the lack of long-term measurements limits the accessibility to reliable data series of erosion rate and sediment yield. Therefore, the observed data of suspended sediment load could be used to ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2011