Single machine sequencing with nonlinear multicriteria cost functions: An application of generalized dynamic programming
نویسندگان
چکیده
Scope and P lupose--A task frequently encounter in operations management is the ~h~uling of tasks or jobs where the attractiveness of the schedule is evaluated relative to multiple performance measures. If there exists a linear multicriteria cost (or penalty) function of these performance measures, then dynamic programming (DP) may be used to find an optimal schedule. However, in the more general case of a nonlinear multicriteria cost function, conventional DP may fail to produce an optimal schedule due to the potential violation of monotonicity. Furthermore, the alternative of first generating the entire efficient set (over which the multicriteria cost function can subsequently be minimized) often requires a prohibitive computational effort. We present an alternative generalized DP approach to this class of problems that guarantees optimaIity, notwithstanding the nonlinearity of the cost function. An example demonstrates that our approach can represent a significant computational improvement over first generating the entire efficient set, and is only slightly more expensive computationally than applying conventional DP, which in this case is only a heuristic.
منابع مشابه
A Multi-Stage Single-Machine Replacement Strategy Using Stochastic Dynamic Programming
In this paper, the single machine replacement problem is being modeled into the frameworks of stochastic dynamic programming and control threshold policy, where some properties of the optimal values of the control thresholds are derived. Using these properties and by minimizing a cost function, the optimal values of two control thresholds for the time between productions of two successive nonco...
متن کاملAn Iterative Decision Rule to minimize cost of Acceptance Sampling Plan in Machine Replacement Problem
In this paper, we presented an optimal iterative decision rule for minimizing total cost in designing a sampling plan for machine replacement problem using the approach of dynamic programming and Bayesian inferences. Cost of replacing the machine and cost of defectives produced by machine has been considered in model. Concept of control threshold policy has been applied for decision making. If ...
متن کاملIntegrated Due Date Setting and Scheduling on a Single Machine Considering an Unexpected Unavailability
In this paper, an integrated machine scheduling withits due date setting problem has been considered. It is assumed that the machine is subject to some kind of random unavailability. Due dates should be set in an attractive and reliable manner, implying that they should be short and possible to be met. To this end, first, long due dates are penalized in the objective function. Then, for each cu...
متن کاملSolving Single Machine Sequencing to Minimize Maximum Lateness Problem Using Mixed Integer Programming
Despite existing various integer programming for sequencing problems, there is not enoughinformation about practical values of the models. This paper considers the problem of minimizing maximumlateness with release dates and presents four different mixed integer programming (MIP) models to solve thisproblem. These models have been formulated for the classical single machine problem, namely sequ...
متن کاملAn approximation algorithm and FPTAS for Tardy/Lost minimization with common due dates on a single machine
This paper addresses the Tardy/Lost penalty minimization with common due dates on a single machine. According to this performance measure, if the tardiness of a job exceeds a predefined value, the job will be lost and penalized by a fixed value. Initially, we present a 2-approximation algorithm and examine its worst case ratio bound. Then, a pseudo-polynomial dynamic programming algorithm is de...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- Computers & OR
دوره 19 شماره
صفحات -
تاریخ انتشار 1992