The Engineering, Installation, Integration and Operation of a 20 Mw Co-generating Turbine Alternator at Hippo Valley Estates

نویسندگان

  • S NDORO
  • J GROENEWALD
  • G WENHAM
چکیده

The installed backpressure power generation capacity at Hippo Valley Estates (HVE) comprised a number of old and small sets, which had become inadequate to reliably supply the total power requirements of the mill and estate. A new 20 MW backpressure turbine alternator (TA) was installed to satisfy the full factory demand on its own and export a surplus to the national grid. The project was completed in fifteen months and the TA was synchronised during the crushing season as planned. This article describes the benefits, identifies the issues and shares some of the lessons learned in engineering, installing and operating the largest unit of its kind in Africa.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Techno-Economic Assessment of Different Inlet Air Cooling Systems in Warm Dry & Wet Climate Stations

Performance of a gas turbine mainly depends on the inlet air temperature. The power output of a gas turbine depends on the flow of mass through it. This is precisely the reason why on hot days, when air is less dense, power output falls. The objective here is to assess the advanced systems applied in reducing the gas turbine intake air temperature and examine the merits from integration of the ...

متن کامل

Improvement of Efficiency of Coal-Fired Steam Power Plant by Reducing Heat Rejection Temperature at Condenser Using Kalina Cycle

This paper proposes an approach for improving the plant efficiency by reducing the heat rejection temperature of power cycle using Kalina Cycle System 11 (KCS11) which is integrated at the steam condenser of a 500 MWe SubC (subcritical) coal-fired power plant. It is modelled by using power plant simulation software ‘Cycle Tempo’ at different plant operating conditions. Results show t...

متن کامل

Design of a Permanent-Magnet Synchronous Generator for a 2 MW Gearless Horizontal-Axis Wind Turbine According to its Capability Curves

Permanent-Magnet Synchronous Generators (PMSGs) exhibit high efficiency and power density, and have already been employed in gearless wind turbines. In the gearless wind turbines, due to the removal of the gearbox, the cogging torque is an important issue. Therefore, in this paper, at first, design of a Permanent-Magnet Synchronous Generator for a 2MW gearless horizontal-axis wind turbine, acco...

متن کامل

Thermodynamic Analysis and Statistical Investigation of Effective Parameters for Gas Turbine Cycle using the Response Surface Methodology

In this paper, the statistical analyses are presented to study the thermal efficiency and power output of gas turbine (GT) power plants. For analyzing gas turbine operation and performance, a novel approach is developed utilizing the response surface methodology (RSM) which is based on the central composite design (CCD) method. An attempt is made to study the effect of some operational factors ...

متن کامل

Design and Development of a Two-megawatt, High Speed Permanent Magnet Alternator for Shipboard Application

Conventional gas turbine generator sets consist of a high speed turbine coupled to a low speed alternator through a speed reduction gearbox. This is required to maintain the alternator output frequency at 50 Hz or 60Hz, as output frequency is directly proportional to speed. Since power is also directly proportional to speed, the conventional system is bulky and possesses a very large footprint....

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2002