Completable Partial Solutions in Constraint Programming and Constraint-Based Scheduling
نویسندگان
چکیده
The paper introduces the notion of freely completable partial solutions to characterize constraint satisfaction problems that have components which are relatively easy to solve and are only loosely connected to the remaining parts of the problem. Discovering such partial solutions during the solution process can result in strongly pruned search trees. We give a general definition of freely completable partial solutions, and then apply it to resource-constrained project scheduling. In this domain, we suggest a heuristic algorithm that is able to construct freely completable partial schedules. The method – together with symmetry breaking applied before search – has been successfully tested on real-life resource-constrained project scheduling problems containing up to 2000 tasks.
منابع مشابه
Agent-based approach for cooperative scheduling
This paper studies the multi-factory production (MFP) network scheduling problem where a number of different individual factories join together to form a MFP network, in which these factories can operate more economically than operating individually. However, in such network which known as virtual production network with self-interested factories with transportation times, each individual facto...
متن کاملComparing Mixed-Integer and Constraint Programming for the No-Wait Flow Shop Problem with Due Date Constraints
The impetus for this research was examining a flow shop problem in which tasks were expected to be successively carried out with no time interval (i.e., no wait time) between them. For this reason, they should be completed by specific dates or deadlines. In this regard, the efficiency of the models was evaluated based on makespan. To solve the NP-Hard problem, we developed two mathematical mode...
متن کاملYard crane scheduling in port container terminals using genetic algorithm
Yard crane is an important resource in container terminals. Efficient utilization of the yard crane significantly improves the productivity and the profitability of the container terminal. This paper presents a mixed integer programming model for the yard crane scheduling problem with non- interference constraint that is NPHARD in nature. In other words, one of the most important constraints in...
متن کاملThree Hybrid Metaheuristic Algorithms for Stochastic Flexible Flow Shop Scheduling Problem with Preventive Maintenance and Budget Constraint
Stochastic flexible flow shop scheduling problem (SFFSSP) is one the main focus of researchers due to the complexity arises from inherent uncertainties and also the difficulty of solving such NP-hard problems. Conventionally, in such problems each machine’s job process time may encounter uncertainty due to their relevant random behaviour. In order to examine such problems more realistically, fi...
متن کاملCONSTRAINT Networks
1 Introduction Constraint-based reasoning is a paradigm for formulating knowledge as a set of constraints without specifying the method by which these constraints are to be satised. A variety of techniques have been developed for nding partial or complete solutions for dierent kinds of constraint expressions. These have been successfully applied to diverse tasks such as design, diagnosis, truth...