Evaluation and Improvement for Large Industrial Projects

نویسنده

  • Piotr Tomaszewski
چکیده

The high non-functional requirements on mobile telecommunication applications call for new solutions. An example of such a solution can be a software platform that provides high performance and availability. The introduction of such a platform may, however, affect the development productivity. In this study we present experiences from research carried out at Ericsson. The purpose of the research was productivity improvement and assessment when using the new platform. In this study we quantify and evaluate the current productivity level by comparing it with UNIX development. The comparison is based on two large, commercially available systems. We reveal a factor of four difference in productivity. Later we decompose the problem into two issues: code writing speed and average amount of code necessary to deliver a certain functionality. We assess the impact of both these issues. We describe the nature of the problem by identifying factors that affect productivity and estimating their importance. To the issues identified we suggest a number of remedies. The main methods used in the study are interviews and historical data research.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Assessment of Improvement of Preventive Maintenance Systems Related to the Civil Projects Using Concepts of Value Engineering (RESEARCH NOTE)

The purpose of this paper is using the concepts of value engineering (VE) in evaluating the improvement caused by preventive maintenance (PM) systems in construction project. A real case is used to show how we can implement the proposed method. VE is the systematic application of recognized techniques by multi-disciplined teams that identifies the function of a product or service, establishes a...

متن کامل

A Fuzzy Decision-Making Methodology for Risk Response Planning in Large-Scale Projects

Risk response planning is one of the main phases in the project risk management and has major impacts on the success of a large-scale project. Since projects are unique, and risks are dynamic through the life of the projects, it is necessary to formulate responses of the important risks. The conventional approaches tend to be less effective in dealing with the impreciseness of risk response p...

متن کامل

Identification of Pattern used in Determination of Critical Success Factors in ITS Projects, Case Study: Road Maintenance and Transportation Organization

One of the risks recognized by relevant authorities is the risk of outsourcing ITS projects. The purpose of this study was to design and explain the pattern of determining the critical success factors in outsourcing large-scale ITS projects in the Ministry of Roads and Urban Development (Road Maintenance and Transportation Organization). This study was performed using qualitative method. The pa...

متن کامل

A Method for Ranking, Assessment and Evaluation of Sustainability Factors in Project

Nowadays, issues such as global climate change, poverty and inequity, and the unsustainable use of resources are driving organizations to incorporate the principles of sustainable development into projects. Sustainable development of organizations and companies requires consideration of all three sustainability dimensions: environmental, economic and social should integrate economic, social and...

متن کامل

A Method for Ranking, Assessment and Evaluation of Sustainability Factors in Project

Nowadays, issues such as global climate change, poverty and inequity, and the unsustainable use of resources are driving organizations to incorporate the principles of sustainable development into projects. Sustainable development of organizations and companies requires consideration of all three sustainability dimensions: environmental, economic and social should integrate economic, social and...

متن کامل

Concurrent control on resource planning and revenue/expenditure estimation in large-scale shell material embankment projects management using discrete-event simulation

Resource planning in large-scale construction projects has been a complicated management issue requiring mechanisms to facilitate decision making for managers. In the present study, a computer-aided simulation model is developed based on concurrent control of resources and revenue/expenditure. The proposed method responds to the demand of resource management and scheduling in shell material emb...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2006