Comparison of Two Probabilistic Techniques for the Assessment of Economic Uncertainty
نویسندگان
چکیده
Several approaches to probabilistic design have been proposed in the past. Only few acknowledged the paradigm shift from performance based design to design for cost. The incorporation of economics in the design process, however, makes a probabilistic approach to design necessary, due to the inherent uncertainty of assumptions and the circumstances of operating environments of the future aircraft. The approach previously proposed by the authors, linking Response Surface Methodology with Monte Carlo Simulations, has revealed itself to be inadequate for multi-constraint, multi-objective problems. In addition accuracy problems were observed that could not be resolved with the methodology. Hence, this paper proposes an alternate approach to probabilistic design, which is based on a Fast Probability Integration (FPI) technique. The paper critically reviews the combined Response Surface Equation/ Monte Carlo Simulation methodology and compares it against the Advanced Mean Value (AMV) method, one of several Fast Probability Integration techniques. The Advanced Mean Value method is a probability estimation method based on a Most Probable Point (MPP) analysis. The paper describes the method employed to identify the Most Probable Point and obtain a cumulative probability distribution. The resulting distribution function is compared to the one generated by the Response Surface Equation/Monte Carlo Simulation method. For this comparison a case study is formulated, employing a High Speed Civil Transport concept. Based on the outcome of this study an assessment and comparison of the analysis effort and time necessary for both methods is performed. If the Most Probable Point can be found efficiently, the Advanced Mean Value method shows significant time savings over the Response Surface Equation/Monte Carlo Simulation method, and generally yields more accurate CDF distributions.
منابع مشابه
Capacitor Placement in Distorted Distribution Network Subject to Wind and Load Uncertainty
Utilizing capacitor banks is very conventional in distribution network in order for local compensation of reactive power. This will be more important considering uncertainties including wind generation and loads uncertainty. Harmonics and non-linear loads are other challenges in power system which complicates the capacitor placement problem. Thus, uncertainty and network harmonics have been con...
متن کاملRobust optimal multi-objective controller design for vehicle rollover prevention
Robust control design of vehicles addresses the effect of uncertainties on the vehicle’s performance. In present study, the robust optimal multi-objective controller design on a non-linear full vehicle dynamic model with 8-degrees of freedom having parameter with probabilistic uncertainty considering two simultaneous conflicting objective functions has been made to prevent the rollover. The obj...
متن کاملProbabilistic Assessment of Pseudo-Static Design of Gravity-Type Quay Walls
Failure of the quay walls due to earthquakes results in severe economic loss. Because of hazards threatening such inexpensive nodes of national and international transportation networks, seismic design of quay walls is still an evolving topic in marine structural engineering. This study investigates the sensitivity of the gravity-type quay wall stability respect to uncertain soil and seismic pr...
متن کاملRule-based joint fuzzy and probabilistic networks
One of the important challenges in Graphical models is the problem of dealing with the uncertainties in the problem. Among graphical networks, fuzzy cognitive map is only capable of modeling fuzzy uncertainty and the Bayesian network is only capable of modeling probabilistic uncertainty. In many real issues, we are faced with both fuzzy and probabilistic uncertainties. In these cases, the propo...
متن کاملUtilizing Decision Making Methods and Optimization Techniques to Develop a Model for International Facility Location Problem under Uncertainty
Abstract The purpose of this study is to consider an international facility location problem under uncertainty and present an integrated model for strategic and operational planning. The paper offers two methodologies for the location selection decision. First the extended VIKOR method for decision making problem with interval numbers is presented as a methodology for strategic evaluation of po...
متن کاملA Prioritization Model for HSE Risk Assessment Using Combined Failure Mode, Effect Analysis, and Fuzzy Inference System: A Case Study in Iranian Construction Industry
The unavailability of sufficient data and uncertainty in modeling, some techniques, and decision-making processes play a significant role in many engineering and management problems. Attain to sure solutions for a problem under accurate consideration is essential. In this paper, an application of fuzzy inference system for modeling the indeterminacy involved in the problem of HSE risk assessm...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 1998