A modeling framework for optimizing the flow-level scheduling with time-varying channels

نویسندگان

  • Urtzi Ayesta
  • Martin Erausquin
  • Peter Jacko
چکیده

We introduce a comprehensive modeling framework for the problem of scheduling a finite number of finite-length jobs where the available service rate is time-varying. The main motivation comes from wireless data networks where the service rate of each user varies randomly due to fading. We employ recent advances on the restless bandit problem that allow to obtain an opportunistic scheduling rule for the system without arrivals. When the objective is to minimize the mean number of users in the system or to minimize the mean waiting time, we obtain a prioritybased policy which we call the “Potential Improvement” (PI) rule, since the priority index equals to the ratio between the current available service rate and the expected potential improvement of the service rate. We also show that for certain objective functions, the index rule takes the form of known opportunistic scheduling rules like “Relatively Best” (RB) or “Proportionally Best” (PB). Thus our model provides a formal justification for the deployment of opportunistic scheduling rules in order to improve the flow-level performance in the presence of time varying capacities. We further analyze the performance of the PI rule in the presence of randomly arriving users. When the service rates are constant, PI is equivalent to the cμ-rule, which is known to be optimal with any distribution of arrivals. Using a recent characterization for the stability region of flow-level scheduling rules under random arrivals, we show that PI achieves the maximum stability region. We perform numerical experiments in a wide range of scenarios and compare the performance of PI with other popular disciplines like RB, PB, Score-Based (SB) and cμ-rule. Our results show that RB, PB, SB or the cμ-rule might outperform the others depending on the scenario, but regardless of this, the performance of PI is always superior or equivalent to the best of these opportunistic rules.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Train Scheduling Problem - Phase I: A General Simulation Modeling Framework

One of the important problems in management of railway systems is train scheduling problem. This is the problem of determining a timetable for a set of trains that do not violate infrastructure capacities and satisfies some operational constraints. In this study, a feasible timetable generator framework for stochastic simulation modeling is developed. The objective is to obtain a feasible tr...

متن کامل

MODELING OF GROUNDWATER FLOW OVER SLOPING BEDS IN RESPONSE TO CONSTANT RECHARGE AND STREAM OF VARYING WATER LEVEL

This paper presents an analytical model characterizing unsteady groundwater flow in an unconfined aquifer resting on a sloping impervious bed. The aquifer is in contact with a constant water level at one end. The other end is connected to a stream whose level is increasing form an initial level to a final level at a known exponentially decaying function of time. Moreover, the aquifer is repleni...

متن کامل

A Mathematical Programming Model for Flow Shop Scheduling Problems for Considering Just in Time Production

  In this paper, we consider a flow shop scheduling problem with bypass consideration for minimizing the sum of earliness and tardiness costs. We propose a new mathematical modeling to formulate this problem. There are several constraints which are involved in our modeling such as the due date of jobs, the job ready times, the earliness and the tardiness cost of jobs, and so on. We apply adapte...

متن کامل

New scheduling rules for a dynamic flexible flow line problem with sequence-dependent setup times

In the literature, the application of multi-objective dynamic scheduling problem and simple priority rules are widely studied. Although these rules are not efficient enough due to simplicity and lack of general insight, composite dispatching rules have a very suitable performance because they result from experiments. In this paper, a dynamic flexible flow line problem with sequence-dependent se...

متن کامل

A New Uncertain Modeling of Production Project Time and Cost Based on Atanassov Fuzzy Sets

  Uncertainty plays a major role in any project evaluation and management process. One of the trickiest parts of any production project work is its cost and time forecasting. Since in the initial phases of production projects uncertainty is at its highest level, a reliable method of project scheduling and cash flow generation is vital to help the managers reach successful implementation of the ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Perform. Eval.

دوره 67  شماره 

صفحات  -

تاریخ انتشار 2010